United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in ISO-NE (New England) (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown224,400 MW
Active in queue866 MW2 requests
Agreement signed866 MW2 requests
Withdrawn224,400 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

22 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Combined Cycle
Gas
1,120 MWWithdrawn / abandoned Windham, CTISO-NE Feb 2016target 2020
Bay State Offshore Wind 1
Offshore wind
800 MWWithdrawn / abandoned MAISO-NE Aug 2016target 2026
Combined Cycle
Gas
563 MWWithdrawn / abandoned Windham, CTISO-NE Mar 2016target 2022
Wind
Onshore wind
376 MWWithdrawn / abandoned Aroostook, MEISO-NE Dec 2016target 2019
Wind
Onshore wind
246 MWWithdrawn / abandoned Franklin, MEISO-NE Jan 2016target 2019
Wind
Onshore wind
216 MWWithdrawn / abandoned Franklin, MEISO-NE Jan 2016target 2019
Solar
Solar
150 MWWithdrawn / abandoned York, MEISO-NE Oct 2016target 2022
Combustion Turbine
Gas
102 MWWithdrawn / abandoned Fairfield, CTISO-NE Apr 2016target 2019
Solar
Solar
98.0 MWWithdrawn / abandoned Cheshire, NHISO-NE Jan 2016target 2018
Wind
Onshore wind
93.6 MWWithdrawn / abandoned Somerset, MEISO-NE Oct 2016target 2020
Solar
Solar
78.4 MWWithdrawn / abandoned Franklin, MEISO-NE Jun 2016target 2018
Solar
Solar
78.4 MWWithdrawn / abandoned Cheshire, NHISO-NE Jun 2016target 2018
Solar
Solar
75.0 MWWithdrawn / abandoned Washington, MEISO-NE Oct 2016target 2022
Steam Turbines
Other
75.0 MWWithdrawn / abandoned Franklin, MEISO-NE Apr 2016target 2018
Combined Cycle GT
Gas
68.0 MWWithdrawn / abandoned Bristol, MAISO-NE Apr 2016target 2020
Solar
Solar
65.0 MWWithdrawn / abandoned Cheshire, NHISO-NE Apr 2016target 2018
Solar
Solar
63.0 MWWithdrawn / abandoned Windham, CTISO-NE Jun 2016target 2018
Combined Cycle Upgrade
Gas
40.0 MWWithdrawn / abandoned Providence, RIISO-NE Apr 2016target 2020
Hydro
Hydro
28.3 MWWithdrawn / abandoned Oxford, MEISO-NE Feb 2016target 2019
Gas Turbine Upgrade
Other
23.5 MWWithdrawn / abandoned New Haven, CTISO-NE Apr 2016target 2020
Combined Cycle Uprate
Gas
21.1 MWWithdrawn / abandoned Providence, RIISO-NE Apr 2016target 2016
Solar
Solar
19.9 MWWithdrawn / abandoned Windsor, VTISO-NE Jul 2016target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)