Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Jove Solar Solar + storage |
4,133 MW | In study |
| Darden Solar + storage |
2,365 MW | Agreement signed |
| Umbriel Solar + storage |
2,365 MW | Agreement signed |
| Wingtip Solar 1 Solar + storage |
2,352 MW | Agreement signed |
| Holman Wind + storage |
2,282 MW | Agreement signed |
| Bouse Solar And Storage Plant Solar + storage |
2,021 MW | In study |
| Plum Solar + storage |
1,560 MW | In study |
| Ranegras PVS Solar + storage |
1,438 MW | In study |
| Euismod Solar + storage |
1,247 MW | Agreement signed |
| Mosey Solar + storage |
1,081 MW | Agreement signed |
| Water Rock Solar 2 Solar + storage |
1,034 MW | In study |
| Silver Star Solar Solar + storage |
1,034 MW | Agreement signed |
| Sunbaked Solar Solar + storage |
1,024 MW | Agreement signed |
| Rock Valley Energy Center Solar + storage |
1,024 MW | Agreement signed |
| Easley Solar + storage |
940 MW | Agreement signed |
| Invictus Solar + storage |
860 MW | In study |
| Artemis Solar + storage |
825 MW | In study |
| Harquahala Flats 2 Solar + storage |
822 MW | In study |
| Valley Sunlight Refinery Solar + storage |
821 MW | In study |
| Solsken Solar + storage |
809 MW | In study |
| Socorro Peak Solar Solar + storage |
756 MW | In study |
| Buttonbush Solar 2 Solar + storage |
716 MW | Agreement signed |
| Presidio Solar + storage |
713 MW | Agreement signed |
| Kawich Solar + storage |
700 MW | Agreement signed |
| Yuha Desert Battery Storage Battery storage |
633 MW | In study |
| Cady Solar Solar + storage |
626 MW | Agreement signed |
| Cherry Lane Hybrid Solar + storage |
621 MW | In study |
| Remy Solar + storage |
617 MW | In study |
| Larrea Solar Solar + storage |
614 MW | In study |
| Australis Solar + storage |
614 MW | Agreement signed |
| Cornucopia Hybrid Solar + storage |
605 MW | Agreement signed |
| Soleil Cantil Solar + storage |
597 MW | In study |
| Twin Palms Solar Solar + storage |
576 MW | Agreement signed |
| Redonda Solar + storage |
542 MW | Agreement signed |
| Sagebrush Energy Storage Battery storage |
528 MW | In study |
| Alta Casa Storage Battery storage |
515 MW | Agreement signed |
| Greasewood Energy Storage Battery storage |
513 MW | Agreement signed |
| Conduit Energy Storage Battery storage |
513 MW | Agreement signed |
| Rosa Storage Battery storage |
512 MW | In study |
| Lock Storage Battery storage |
508 MW | Agreement signed |
| Drifter Energy Storage Battery storage |
505 MW | Agreement signed |
| Spectrum Energy Storage Battery storage |
504 MW | Agreement signed |
| Delilah Energy Storage Battery storage |
504 MW | Agreement signed |
| Sterling Solar + storage |
500 MW | In study |
| Corby 2 Battery storage |
476 MW | In study |
| Mineral King Solar Solar + storage |
430 MW | In study |
| Boulder Brush Hybrid Wind + storage |
420 MW | In study |
| Tolenas Battery storage |
417 MW | In study |
| Alisa Solar Energy Complex Solar + storage |
417 MW | In study |
| Elysian Solar + storage |
412 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)228 Β· 68.8 GW
- CAISO (California)138 Β· 66.9 GW
- ERCOT (Texas)207 Β· 39.5 GW
- MISO (Midcontinent)136 Β· 23.7 GW
- Southeast (non-ISO utilities)63 Β· 12.7 GW
- SPP (Southwest Power Pool)44 Β· 9,029 MW
- ISO-NE (New England)20 Β· 3,998 MW
- PJM (Mid-Atlantic, Midwest)49 Β· 2,072 MW
- NYISO (New York)11 Β· 991 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)