Interconnection queue in CAISO (California) (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown13866.9 GW
Active in queue66.9 GW138 requests
Agreement signed35.4 GW68 requests
Withdrawn22082.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

138 requests Β· page 1 of 3
ProjectCapacityStatusLocationRegionQueuedOnline
Jove Solar
Solar + storage
4,133 MWIn study La Paz, AZCAISO Apr 2021target 2030
Darden
Solar + storage
2,365 MWAgreement signed Fresno, CACAISO Apr 2021target 2028
Umbriel
Solar + storage
2,365 MWAgreement signed Imperial, CACAISO Apr 2021target 2035
Wingtip Solar 1
Solar + storage
2,352 MWAgreement signed Merced, CACAISO Apr 2021target 2032
Holman
Wind + storage
2,282 MWAgreement signed Monterey, CACAISO Apr 2021target 2034
Bouse Solar And Storage Plant
Solar + storage
2,021 MWIn study La Paz, AZCAISO Apr 2021target 2033
Plum
Solar + storage
1,560 MWIn study Kings, CACAISO Apr 2021target 2031
Ranegras PVS
Solar + storage
1,438 MWIn study La Paz, AZCAISO Apr 2021target 2029
Euismod
Solar + storage
1,247 MWAgreement signed Kern, CACAISO Apr 2021target 2028
Mosey
Solar + storage
1,081 MWAgreement signed Clark, NVCAISO Apr 2021target 2029
Water Rock Solar 2
Solar + storage
1,034 MWIn study Nye, NVCAISO Apr 2021target 2028
Silver Star Solar
Solar + storage
1,034 MWAgreement signed Nye, NVCAISO Apr 2021target 2028
Sunbaked Solar
Solar + storage
1,024 MWAgreement signed Inyo, CACAISO Apr 2021target 2029
Rock Valley Energy Center
Solar + storage
1,024 MWAgreement signed Nye, NVCAISO Apr 2021target 2029
Easley
Solar + storage
940 MWAgreement signed Riverside, CACAISO Apr 2021target 2028
Invictus
Solar + storage
860 MWIn study Riverside, CACAISO Apr 2021target 2029
Artemis
Solar + storage
825 MWIn study Kern, CACAISO Apr 2021target 2029
Harquahala Flats 2
Solar + storage
822 MWIn study Maricopa, AZCAISO Apr 2021target 2028
Valley Sunlight Refinery
Solar + storage
821 MWIn study Kings, CACAISO Apr 2021target 2032
Solsken
Solar + storage
809 MWIn study Tulare, CACAISO Apr 2021target 2033
Socorro Peak Solar
Solar + storage
756 MWIn study La Paz, AZCAISO Apr 2021target 2029
Buttonbush Solar 2
Solar + storage
716 MWAgreement signed Kern, CACAISO Apr 2021target 2032
Presidio
Solar + storage
713 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2030
Kawich
Solar + storage
700 MWAgreement signed Clark, NVCAISO Apr 2021target 2029
Yuha Desert Battery Storage
Battery storage
633 MWIn study Imperial, CACAISO Apr 2021target 2031
Cady Solar
Solar + storage
626 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Cherry Lane Hybrid
Solar + storage
621 MWIn study Kern, CACAISO Apr 2021target 2031
Remy
Solar + storage
617 MWIn study Yuma, AZCAISO Apr 2021target 2029
Larrea Solar
Solar + storage
614 MWIn study Clark, NVCAISO Apr 2021target 2028
Australis
Solar + storage
614 MWAgreement signed Merced, CACAISO Apr 2021target 2031
Cornucopia Hybrid
Solar + storage
605 MWAgreement signed Fresno, CACAISO Apr 2021target 2030
Soleil Cantil
Solar + storage
597 MWIn study Kern, CACAISO Apr 2021target 2033
Twin Palms Solar
Solar + storage
576 MWAgreement signed Riverside, CACAISO Apr 2021target 2030
Redonda
Solar + storage
542 MWAgreement signed Riverside, CACAISO Apr 2021target 2031
Sagebrush Energy Storage
Battery storage
528 MWIn study Kern, CACAISO Apr 2021target 2033
Alta Casa Storage
Battery storage
515 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2031
Greasewood Energy Storage
Battery storage
513 MWAgreement signed Kern, CACAISO Apr 2021target 2033
Conduit Energy Storage
Battery storage
513 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Rosa Storage
Battery storage
512 MWIn study Ventura, CACAISO Apr 2021target 2034
Lock Storage
Battery storage
508 MWAgreement signed Fresno, CACAISO Apr 2021target 2027
Drifter Energy Storage
Battery storage
505 MWAgreement signed Ventura, CACAISO Apr 2021target 2033
Spectrum Energy Storage
Battery storage
504 MWAgreement signed Alameda, CACAISO Apr 2021target 2032
Delilah Energy Storage
Battery storage
504 MWAgreement signed Contra Costa, CACAISO Apr 2021target 2032
Sterling
Solar + storage
500 MWIn study Clark, NVCAISO Apr 2021target 2031
Corby 2
Battery storage
476 MWIn study Solano, CACAISO Apr 2021target 2031
Mineral King Solar
Solar + storage
430 MWIn study Tulare, CACAISO Apr 2021target 2029
Boulder Brush Hybrid
Wind + storage
420 MWIn study San Diego, CACAISO Apr 2021target 2031
Tolenas
Battery storage
417 MWIn study Solano, CACAISO Apr 2021target 2031
Alisa Solar Energy Complex
Solar + storage
417 MWIn study Yuma, AZCAISO Apr 2021target 2028
Elysian
Solar + storage
412 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
Page 1 of 3

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)