Queue requests in study in CAISO (California) (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7031.5 GW
Active in queue66.9 GW138 requests
Agreement signed35.4 GW68 requests
Withdrawn22082.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

70 requests Β· page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Jove Solar
Solar + storage
4,133 MWIn study La Paz, AZCAISO Apr 2021target 2030
Bouse Solar And Storage Plant
Solar + storage
2,021 MWIn study La Paz, AZCAISO Apr 2021target 2033
Plum
Solar + storage
1,560 MWIn study Kings, CACAISO Apr 2021target 2031
Ranegras PVS
Solar + storage
1,438 MWIn study La Paz, AZCAISO Apr 2021target 2029
Water Rock Solar 2
Solar + storage
1,034 MWIn study Nye, NVCAISO Apr 2021target 2028
Invictus
Solar + storage
860 MWIn study Riverside, CACAISO Apr 2021target 2029
Artemis
Solar + storage
825 MWIn study Kern, CACAISO Apr 2021target 2029
Harquahala Flats 2
Solar + storage
822 MWIn study Maricopa, AZCAISO Apr 2021target 2028
Valley Sunlight Refinery
Solar + storage
821 MWIn study Kings, CACAISO Apr 2021target 2032
Solsken
Solar + storage
809 MWIn study Tulare, CACAISO Apr 2021target 2033
Socorro Peak Solar
Solar + storage
756 MWIn study La Paz, AZCAISO Apr 2021target 2029
Yuha Desert Battery Storage
Battery storage
633 MWIn study Imperial, CACAISO Apr 2021target 2031
Cherry Lane Hybrid
Solar + storage
621 MWIn study Kern, CACAISO Apr 2021target 2031
Remy
Solar + storage
617 MWIn study Yuma, AZCAISO Apr 2021target 2029
Larrea Solar
Solar + storage
614 MWIn study Clark, NVCAISO Apr 2021target 2028
Soleil Cantil
Solar + storage
597 MWIn study Kern, CACAISO Apr 2021target 2033
Sagebrush Energy Storage
Battery storage
528 MWIn study Kern, CACAISO Apr 2021target 2033
Rosa Storage
Battery storage
512 MWIn study Ventura, CACAISO Apr 2021target 2034
Sterling
Solar + storage
500 MWIn study Clark, NVCAISO Apr 2021target 2031
Corby 2
Battery storage
476 MWIn study Solano, CACAISO Apr 2021target 2031
Mineral King Solar
Solar + storage
430 MWIn study Tulare, CACAISO Apr 2021target 2029
Boulder Brush Hybrid
Wind + storage
420 MWIn study San Diego, CACAISO Apr 2021target 2031
Tolenas
Battery storage
417 MWIn study Solano, CACAISO Apr 2021target 2031
Alisa Solar Energy Complex
Solar + storage
417 MWIn study Yuma, AZCAISO Apr 2021target 2028
Lotus Solar 2
Solar + storage
406 MWIn study Madera, CACAISO Apr 2021target 2030
Simon
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Coral Reef
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Fleetwood
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Dirac
Battery storage
403 MWIn study San Bernardino, CACAISO Apr 2021target 2031
Brushy
Battery storage
400 MWIn study Solano, CACAISO Apr 2021target 2031
Northeast Central Valley
Battery storage
365 MWIn study San Joaquin, CACAISO Apr 2021target 2031
Dandelion Hybrid Solar
Solar + storage
334 MWIn study Nye, NVCAISO Apr 2021target 2027
Harquahala Sunrise 2
Solar + storage
330 MWIn study Maricopa, AZCAISO Apr 2021target 2026
Cargo Storage
Battery storage
313 MWIn study San Diego, CACAISO Apr 2021target 2036
Bell Bluff Storage
Battery storage
313 MWIn study San Diego, CACAISO Apr 2021target 2035
Harmony Storage 2
Battery storage
308 MWIn study Contra Costa, CACAISO Apr 2021target 2031
Juniper Storage
Solar + storage
307 MWIn study Los Angeles, CACAISO Apr 2021target 2033
Gnarly Osage
Battery storage
304 MWIn study San Diego, CACAISO Apr 2021target 2027
Carmine
Battery storage
292 MWIn study Riverside, CACAISO Apr 2021target 2031
Delamar Energy Storage 2
Battery storage
256 MWIn study Clark, NVCAISO Apr 2021target 2027
Almande Energy Storage
Battery storage
256 MWIn study Merced, CACAISO Apr 2021target 2030
Sherman Energy Storage
Battery storage
256 MWIn study Contra Costa, CACAISO Apr 2021target 2031
Gateway Energy Storage 2
Battery storage
256 MWIn study San Diego, CACAISO Apr 2021target 2035
Sandbar Energy Storage
Battery storage
256 MWIn study San Diego, CACAISO Apr 2021target 2030
Weston Storage
Battery storage
214 MWIn study San Bernardino, CACAISO Apr 2021target 2031
Frigatebird Storage
Battery storage
214 MWIn study San Diego, CACAISO Apr 2021target 2035
Phaenon
Solar + storage
204 MWIn study Kern, CACAISO Apr 2021target 2029
Puma Storage
Battery storage
204 MWIn study Madera, CACAISO Apr 2021target 2030
Everest Energy Storage
Battery storage
202 MWIn study Kern, CACAISO Apr 2021target 2030
Merlin Storage
Battery storage
200 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)