United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA (2022 requests) — page 8
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Legato BESS Battery storage · Legato Storage, LLC |
203 MW | In study |
| Fortissimo BESS Battery storage · Fortissimo BESS, LCC |
203 MW | In study |
| Fiji Solar Solar |
203 MW | Paused / redesign |
| McMEXICO STORAGE Battery storage · FRESH AIR ENERGY II, LLC |
202 MW | In study |
| Hacienda Storage Battery storage · Galveston Energy Storage LLC |
202 MW | In study |
| Staccato BESS Battery storage · Staccato Storage, LLC |
202 MW | In study |
| Mitchell Plant Road Storage Battery storage |
202 MW | Paused / redesign |
| Mitchell Plant Road Solar Solar |
202 MW | Paused / redesign |
| Nockenut Springs Solar 4 Solar · Pecan Springs Energy, LLC |
201 MW | In study |
| Seragio BESS Battery storage · Seragio BESS, LLC |
201 MW | In study |
| Jasper BESS Battery storage · Jasper BESS, LLC |
201 MW | In study |
| Blue Heron BESS Battery storage · Blue Heron BESS, LLC |
201 MW | In study |
| Moonlight Sonata BESS Battery storage · Samsung Solar Energy 2, LLC |
201 MW | In study |
| De Los Santos Battery storage · BRP De Los Santos BESS LLC |
201 MW | In study |
| Smokey Willie Solar SLF Solar + storage · Neches Solar, LLC |
201 MW | In study |
| Possum Kingdom BESS Solar + storage · PK Solar, LLC |
201 MW | In study |
| Sloan Storage Battery storage · Sloan Energy Storage LLC |
201 MW | In study |
| Trelas Battery storage · Trelasol, LLC |
201 MW | In study |
| Forts Trail Solar Solar + storage · JC Central Bluff, LLC |
201 MW | In study |
| HGP Pacesetter BESS Battery storage |
201 MW | Paused / redesign |
| Triangle Ranch Bravo Onshore wind · Triangle Ranch Wind |
200 MW | In study |
| Triangle Ranch Charlie Onshore wind |
200 MW | Paused / redesign |
| Pepper Hammock Solar Solar |
200 MW | In study |
| Solar project 512, Lee County Solar |
200 MW | In study |
| Solar project J3039, Olmsted County Solar |
200 MW | In study |
| Solar project AH2-397, Somerset County Solar |
200 MW | In study |
| Solar project J2566, Daviess County Solar |
200 MW | In study |
| Solar project J2520, Adams County Solar |
200 MW | In study |
| Onshore wind project J2332, Cottonwood County Onshore wind |
200 MW | In study |
| Battery storage project J2852, Roberts County Battery storage |
200 MW | In study |
| Surplus; Three Waters Wind Wind + storage |
200 MW | In study |
| Wind + storage project 22-07252, Larimer County Wind + storage |
200 MW | In study |
| Solar project J2878, Sanilac County Solar |
200 MW | In study |
| Solar project J2403, Johnson County Solar |
200 MW | In study |
| Battery storage project J2991, Wayne County Battery storage |
200 MW | In study |
| Solar project J3170, Avoyelles Parish County Solar |
200 MW | In study |
| Solar project J2524, Stoddard County Solar |
200 MW | In study |
| Battery storage project J3031, Jefferson County Battery storage |
200 MW | In study |
| Battery storage project G0801, Douglas County Battery storage |
200 MW | In study |
| Solar + storage project IC-1013, Oglethorpe County Solar + storage |
200 MW | Paused / redesign |
| Solar + storage project G0745, Adams County Solar + storage |
200 MW | In study |
| Onshore wind project J2049, Shelby County Onshore wind |
200 MW | In study |
| Battery storage project G0803, Lane County Battery storage |
200 MW | In study |
| Battery storage project J2402, Johnson County Battery storage |
200 MW | In study |
| Solar project J2330, Leflore County Solar |
200 MW | In study |
| Battery storage project 641, Power County Battery storage · Fresh Air Energy II, LLC |
200 MW | Paused / redesign |
| Solar project J2729, West Baton Rouge Parish, La County Solar |
200 MW | In study |
| Battery storage project J2663, White County Battery storage |
200 MW | In study |
| Solar + storage project AI1-039, Clearfield County Solar + storage |
200 MW | In study |
| Solar + storage project 421, Stillwater County Solar + storage |
200 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)251 · 87.7 GW
- MISO (Midcontinent)426 · 80.7 GW
- PJM (Mid-Atlantic, Midwest)301 · 37.9 GW
- ERCOT (Texas)172 · 33.5 GW
- Southeast (non-ISO utilities)98 · 11.2 GW
- SPP (Southwest Power Pool)21 · 3,927 MW
- ISO-NE (New England)2 · 325 MW
- NYISO (New York)1 · 20.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)