United States βΊ Grid βΊ Interconnection queues
WIND + STORAGE Β· MISOSurplus; Three Waters Wind
Surplus; Three Waters Wind is a 200 MW wind + storage request in interconnection study in the MISO interconnection queue, connecting to ITC MIDWEST.
Queue statusIn planning
- PlanningQueued Jan 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- S1013
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Lakefield Junction 345kV
- Technology
- Wind: 200 MW Β· Other
- Total requested
- 200 MW
- Queue status
- Active
- Entered queue
- 26 January 2022
- Proposed online date
- June 2026
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem