United States › Grid › Interconnection queues › Mississippi

SOLAR · SOUTHEAST

Solar project 512, Lee County

Solar project 512, Lee County is a 200 MW solar request in interconnection study in the Southeast interconnection queue, in Lee County, Mississippi, connecting to Tennessee Valley Authority.

Queue statusIn planning
  1. PlanningQueued Aug 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
512
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Tennessee Valley Authority
Connection point (POI)
Union - Tupelo No. 3 161-kV TL
Location
Lee County, Mississippi
Technology
Solar: 200 MW
Total requested
200 MW
Study phase
Facility Study
Queue status
Active
Entered queue
23 August 2022
Proposed online date
December 2028

Location

Marker shows the centre of Lee County; the queue data does not give exact sites.

Power plants in Mississippi · Transmission lines in Mississippi

Other requests in Lee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem