United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 8
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project G0948, Sherman County Battery storage |
650 MW | In study |
| Battery storage project G0947, Sherman County Battery storage |
650 MW | In study |
| Battery storage project G0796, Sherman County Battery storage |
650 MW | In study |
| Battery storage project G0778, Umatilla County Battery storage |
650 MW | In study |
| Gas project J3604, Sullivan County Gas |
650 MW | In study |
| Battery storage project G0965, Umatilla County Battery storage |
650 MW | In study |
| Battery storage project G0774, Wasco County Battery storage |
650 MW | In study |
| Battery storage project G0946, Sherman County Battery storage |
650 MW | In study |
| Battery storage project G0792, Sherman County Battery storage |
650 MW | In study |
| Nuclear project J3932, Linn County Nuclear |
646 MW | In study |
| Hydro project G0566, Lincoln County Hydro |
646 MW | In study |
| Gas project JEA-Q008, Duval County Gas |
645 MW | In study |
| Gas project J3084, Sullivan County Gas |
642 MW | In study |
| Commodus 2 Wind Onshore wind · IP Blackwell II, LLC |
642 MW | In study |
| Commodus Wind Onshore wind · IP Blackwell, LLC |
641 MW | In study |
| Cavell Wind Onshore wind · IP Cavell, LLC |
641 MW | In study |
| Solar + storage project T2-070, Harney County Solar + storage |
640 MW | In study |
| Yuha Desert Battery Storage Battery storage |
633 MW | In study |
| Malden BESS Battery storage · NIPSCO |
630 MW | In study |
| Solar project J2261, Jackson County Solar |
625 MW | In study |
| Solar project J2262, Jackson County Solar |
625 MW | In study |
| Aurelius 3 Wind Onshore wind · IP Roman III, LLC |
623 MW | In study |
| Aurelius 2 Wind Onshore wind · IP Roman Wind II, LLC |
622 MW | In study |
| Cherry Lane Hybrid Solar + storage |
621 MW | In study |
| Gas project 569, Lowndes County Gas |
620 MW | In study |
| Harquahala Sunrise Solar + storage |
618 MW | In study |
| Howard Road BESS Battery storage · Project Fast Flow LLC |
618 MW | In study |
| Remy Solar + storage |
617 MW | In study |
| Replacing 615 MW Coal with 615 MW BESS; Campbell Units 1 & 2 Other |
615 MW | In study |
| Comanche BESS Battery storage · ENERGOS BESS |
614 MW | In study |
| Larrea Solar Solar + storage |
614 MW | In study |
| Tumbleweed Solar Solar + storage · Hecate Energy Tumbleweed Solar LLC |
614 MW | In study |
| Sunvine Solar + storage |
614 MW | In study |
| Symphony BESS Battery storage · Symphony BESS, LLC |
612 MW | In study |
| Skylab Solar Solar · EDF Renewables Development, Inc. |
610 MW | In study |
| Maestro Solar + storage |
609 MW | In study |
| White Oak King Wind Onshore wind · KSK Wind Farm 1, LLC |
607 MW | In study |
| Kingsmill Wind SLF Onshore wind · Kingsmill Wind, LLC |
606 MW | In study |
| Lavita BESS Battery storage · Lavita BESS, LLC |
606 MW | In study |
| Hiru Solar Solar + storage · Hecate Energy Hazel LLC |
604 MW | In study |
| Moccasin Storage Solar + storage · ENGIE IR Holdings LLC |
603 MW | In study |
| Onshore wind project 5RSC-2024-17, Kit Carson County Onshore wind |
603 MW | In study |
| Hobby BESS I Battery storage · Airport Storage II LLC |
603 MW | In study |
| Rocking X Solar Solar · 7100 Tin Top LLC |
602 MW | In study |
| Reunion Solar Solar + storage · Reunion Solar, LLC |
601 MW | In study |
| Solar + storage project Company 201, Clark County Solar + storage |
600 MW | Paused / redesign |
| Solar + storage project Q488, Maricopa County Solar + storage |
600 MW | In study |
| Scorpius Solar Solar · Ben Milam Solar 4 |
600 MW | In study |
| Battery storage project G0807, Douglas County Battery storage |
600 MW | In study |
| Battery storage project G0642, Crook County Battery storage |
600 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)