United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in Texas — page 8
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project J3045, Orange County Solar |
300 MW | In study |
| Wisdom Solar SLF Solar + storage · Wisdom Green Energy LLC |
299 MW | In study |
| Barranca Wind 2 Onshore wind · Barranca Wind Energy, LLC |
299 MW | In study |
| Camino Ranch Storage SLF Solar + storage · Camino Solar Ranch, LLC |
298 MW | In study |
| Palo Verde Wind Wind + storage · RWE Clean Energy Development, LLC |
298 MW | In study |
| Camino Ranch Solar SLF Solar + storage · Camino Ranch Solar Project LLC |
296 MW | In study |
| Columbine Wind Onshore wind · Wilson Wind LLC |
295 MW | In study |
| Sanders Hollow Energy Center Onshore wind · Sanders Hollow Energy Center, LLC |
293 MW | In study |
| Vista Bluff Wind 2 Onshore wind |
290 MW | Paused / redesign |
| Vista Bluff Wind 1 Onshore wind |
290 MW | Paused / redesign |
| Vista Bluff Wind II "Alternate POI" Onshore wind · Vista Bluff Windpower, LLC |
290 MW | In study |
| Vista Bluff Wind I "Alternate POI" Onshore wind · Vista Bluff Windpower, LLC |
290 MW | In study |
| Tres Rios Ranch BESS Solar + storage · LectricWind LLC |
290 MW | In study |
| Shifting Gale Wind Onshore wind |
289 MW | Paused / redesign |
| Onshore wind project J3902, Jefferson County Onshore wind |
289 MW | In study |
| Sandow Solar Solar · Sandow Lakes Ranch Solar I, LLC |
287 MW | In study |
| Baker Branch BESS Battery storage · Mockingbird Storage Center, LLC |
287 MW | In study |
| Inadale BESS Solar + storage · Inadale BESS, LLC |
287 MW | In study |
| Fierce River BESS Solar + storage · Rio Grande Solar LLC |
285 MW | In study |
| Fivemile Wind Onshore wind · Longview Wind, LLC |
282 MW | In study |
| Impala Flats Wind Onshore wind · Antelope Flats Wind, LLC |
282 MW | In study |
| Treehouse Solar Solar + storage · Treehouse Solar, LLC |
282 MW | In study |
| Jukebox Solar Solar · ACE DevCo NC, LLC |
281 MW | In study |
| Inadale Solar Solar + storage · Inadale Solar, LLC |
281 MW | In study |
| Solar + storage project GEN-2024-015, Yoakum County Solar + storage |
280 MW | In study |
| Unicorn BESS Battery storage · Unicorn Energies |
279 MW | In study |
| Pease River Solar Solar · Pease River Solar LLC |
276 MW | In study |
| Blue Hills Wind Onshore wind |
276 MW | Paused / redesign |
| Roboman Solar Solar · Roboman Solar, LLC |
273 MW | In study |
| Solar project J3986, Liberty County Solar |
270 MW | In study |
| Santa Garcias Solar Solar · Oxy Renewable Energy LLC |
265 MW | In study |
| Possum Kingdom Solar Solar + storage · PK Solar, LLC |
262 MW | In study |
| Charolais Solar Solar + storage · RWE Solar Development, LLC |
262 MW | In study |
| Velociraptor BESS II Solar + storage · Greyhound BESS 3 LLC |
261 MW | In study |
| Velociraptor BESS I Solar + storage · Greyhound BESS 2 LLC |
261 MW | In study |
| Verily Solar (FKA Cuello De Cuero Solar) Solar · NextEra Energy Interconnection Holdings, LLC |
261 MW | In study |
| Homestead Power (TEF-Due Diligence) Gas · Homestead Power LLC |
260 MW | In study |
| Ochoa Energy Storage Battery storage · Ochoa Energy Storage LLC |
260 MW | In study |
| Jay Flat BESS Battery storage · Jay Flat BESS LLC |
259 MW | In study |
| Horsepower BESS Battery storage · Horsepower BESS, LLC |
258 MW | In study |
| Masava Storage Battery storage · Savannah Oaks Solar Project, LLC |
257 MW | In study |
| Saddlehorn Energy Storage Battery storage · Saddlehorn, LLC |
257 MW | In study |
| Van Zandt Energy Storage Battery storage · Rocky Mountain Energy Holdings, LLC |
257 MW | In study |
| Shamrock II Wind Onshore wind |
257 MW | Paused / redesign |
| Rex Storage Battery storage · Rex BESS, LLC |
256 MW | In study |
| Bell County Morgan Storage Battery storage · DM-BCTRM, LLC |
256 MW | In study |
| Sunburst BESS Solar + storage · Indigo Solar, LLC |
256 MW | In study |
| Nautilus Heavy Storage Battery storage · Nautilus Heavy Storage, LLC |
256 MW | In study |
| Leaning Tree BESS Battery storage |
256 MW | Paused / redesign |
| Maleza Storage II Battery storage · Brush Storage, LLC |
256 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,398 · 327.9 GW
- SPP (Southwest Power Pool)61 · 16.6 GW
- MISO (Midcontinent)22 · 6,012 MW
- West (non-ISO utilities)5 · 997 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)