Withdrawn queue requests in Massachusetts — page 8

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown37048.3 GW
Active in queue11.2 GW35 requests
Agreement signed6,013 MW17 requests
Withdrawn37048.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

370 requests · page 8 of 8
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + Battery Storage
Solar + storage
2.5 MWWithdrawn / abandoned Bristol, MAISO-NE Apr 2021target 2021
Solar + Battery Storage
Solar + storage
2.4 MWWithdrawn / abandoned Bristol, MAISO-NE Apr 2020target 2021
Individual @ French King
Solar + storage
2.2 MWWithdrawn / abandoned Franklin, MAISO-NE Jun 2023
Solar + Battery
Solar + storage
2.0 MWWithdrawn / abandoned Plymouth, MAISO-NE Apr 2020target 2025
Pratts Junction substation - NG Western MA Area Cluster Study
Solar
2.0 MWWithdrawn / abandoned Worcester, MAISO-NE Mar 2019target 2020
Individual @ Amherst
Battery storage
2.0 MWWithdrawn / abandoned Hampshire, MAISO-NE Jun 2023target 2024
Solar + Battery Storage
Solar + storage
2.0 MWWithdrawn / abandoned Berkshire, MAISO-NE May 2020target 2022
Solar + Battery Storage
Solar + storage
2.0 MWWithdrawn / abandoned Franklin, MAISO-NE Apr 2021target 2022
Prospect Street substation - NG Western MA Area Cluster Study
Solar
2.0 MWWithdrawn / abandoned Worcester, MAISO-NE Mar 2019target 2020
Crystal Spring 646 - EMA ASO
Solar + storage
1.7 MWWithdrawn / abandoned Plymouth, MAISO-NE Jun 2022target 2023
Southbridge LFGTE Engine 2
Other
1.6 MWWithdrawn / abandoned Worcester, MAISO-NE Jun 2015target 2018
Barre Mass Landfill Gas
Other
1.6 MWWithdrawn / abandoned Worcester, MAISO-NE Dec 2007target 2011
Mashpee 946 - EMA ASO
Solar + storage
1.5 MWWithdrawn / abandoned Barnstable, MAISO-NE Jun 2022target 2023
Depot Street Substation – NG Hopedale West Group Study
Solar + storage
1.5 MWWithdrawn / abandoned Worcester, MAISO-NE Sep 2022target 2025
Solar
Solar + storage
1.0 MWWithdrawn / abandoned Dukes, MAISO-NE Jun 2021target 2022
Solar plus Battery
Solar + storage
1.0 MWWithdrawn / abandoned Worcester, MAISO-NE Jan 2022target 2022
Solar + Battery Storage
Solar + storage
1.0 MWWithdrawn / abandoned Barnstable, MAISO-NE Apr 2021target 2022
Hydro Increase
Hydro
0.1 MWWithdrawn / abandoned Hampden, MAISO-NE Sep 2013target 2014
Solar plus Battery Increase (QP1129)
Solar + storage
0.0 MWWithdrawn / abandoned Bristol, MAISO-NE Aug 2022target 2022
Potter Repowering
Gas
-21.2 MWWithdrawn / abandoned Norfolk, MAISO-NE Feb 2014target 2019
Page 8 of 8

Capacity in the queue by state

Click a state to drill down.

By grid region

ISO/RTO markets and the non-ISO West and Southeast.

Requests by year joined

Capacity of requests in this view, by the year they entered the queue. Click a year.

20102025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)