| Project | Capacity | Status |
|---|---|---|
| Solar + Battery Storage Solar + storage |
2.5 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
2.4 MW | Withdrawn / abandoned |
| Individual @ French King Solar + storage |
2.2 MW | Withdrawn / abandoned |
| Solar + Battery Solar + storage |
2.0 MW | Withdrawn / abandoned |
| Pratts Junction substation - NG Western MA Area Cluster Study Solar |
2.0 MW | Withdrawn / abandoned |
| Individual @ Amherst Battery storage |
2.0 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
2.0 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
2.0 MW | Withdrawn / abandoned |
| Prospect Street substation - NG Western MA Area Cluster Study Solar |
2.0 MW | Withdrawn / abandoned |
| Crystal Spring 646 - EMA ASO Solar + storage |
1.7 MW | Withdrawn / abandoned |
| Southbridge LFGTE Engine 2 Other |
1.6 MW | Withdrawn / abandoned |
| Barre Mass Landfill Gas Other |
1.6 MW | Withdrawn / abandoned |
| Mashpee 946 - EMA ASO Solar + storage |
1.5 MW | Withdrawn / abandoned |
| Depot Street Substation – NG Hopedale West Group Study Solar + storage |
1.5 MW | Withdrawn / abandoned |
| Solar Solar + storage |
1.0 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
1.0 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
1.0 MW | Withdrawn / abandoned |
| Hydro Increase Hydro |
0.1 MW | Withdrawn / abandoned |
| Solar plus Battery Increase (QP1129) Solar + storage |
0.0 MW | Withdrawn / abandoned |
| Potter Repowering Gas |
-21.2 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)