United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas (2025 requests) — page 7
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| White Wing Solar Solar + storage · White Wing Solar, LLC |
127 MW | In study |
| Bunting Solar Project Solar · H4 Solar Project LLC |
126 MW | In study |
| Three Ranches Solar Solar + storage · Three Ranches Energy LLC |
126 MW | In study |
| Great Hambino BESS Battery storage · Atascosa BESS, LLC |
123 MW | In study |
| Arnold Hills Storage Battery storage · Arnold Hills Storage, LLC |
123 MW | In study |
| Iron Cowboy Solar Solar + storage · Vaquero II Solar, LLC |
121 MW | In study |
| Wagyu BESS SLF Battery storage · Wagyu BESS, LLC |
121 MW | In study |
| Borden Dino Solar Solar + storage · Borden Dino Solar, LLC |
121 MW | In study |
| Neal Battery Solar + storage · CH Neal Battery LLC |
121 MW | In study |
| Buffalo Gap 1 Wind Repower Onshore wind · Buffalo Gap Wind Farm, LLC |
120 MW | Agreement signed |
| Solar project GEN-2024-123, Shelby County Solar |
120 MW | In study |
| Amphion Solar Phase 3 Solar · Amphion Solar, LLC |
115 MW | In study |
| Lost Pines Gas Recip Phase 2 Gas · LCRA |
113 MW | In study |
| Schneider Gas Rice Gas · LCRA |
113 MW | In study |
| Lost Pines Gas Recip Gas · LCRA |
113 MW | In study |
| Schneider Gas Rice Phase 2 Gas · LCRA |
113 MW | In study |
| Coyote Ridge BESS Battery storage · Grenergy USA |
111 MW | In study |
| Carpet Tech Solar One Solar · CT Solar One |
111 MW | In study |
| Rain Lily Storage 1 Solar + storage · Rain Lily Storage One, LLC |
106 MW | In study |
| Bonham Storage SLF Solar + storage · J&J Solar Ranch LLC |
105 MW | In study |
| Yellow Leaf Solar Solar + storage · Lightsource Renewable Energy Development LLC |
105 MW | In study |
| Power Lane II Gas Gas · GEUS |
104 MW | In study |
| Rockpile Storage Battery storage · Rockpile Storage, LLC |
104 MW | In study |
| Yellow Leaf BESS Solar + storage · Lightsource Renewable Energy Development LLC |
104 MW | In study |
| Three Ranches BESS Solar + storage · Three Ranches Energy LLC |
103 MW | In study |
| Rio Vista Storage Solar + storage · Rio Vista Storage, LLC |
103 MW | In study |
| Wisdom BESS SLF Solar + storage · Wisdom Green Energy LLC |
103 MW | In study |
| Prairie Horizon Energy Storage 4 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Blackland Prairie 1 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 6 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 2 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Edgewood BESS 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 1 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 3 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 3 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 4 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 4 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Blackland Prairie 2 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 5 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 3 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 8 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 7 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Blackland Prairie 3 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Crocus Solar Solar + storage · Crocus Solar, LLC |
102 MW | In study |
| Greyhound Solar - Phase F Solar · ROCKHOUND SOLAR 2 LLC DBA GREYHOUND SOLAR |
102 MW | Agreement signed |
| Margay Energy Storage Battery storage · PowerPulse LLC |
101 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)358 · 104.0 GW
- SPP (Southwest Power Pool)33 · 9,266 MW
- MISO (Midcontinent)6 · 2,017 MW
- West (non-ISO utilities)5 · 997 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)