Completed queue projects in California — page 5

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown22935.9 GW
Active in queue179.2 GW464 requests
Agreement signed81.7 GW215 requests
Withdrawn2,138571.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

229 requests · page 5 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Morelos Del Sol (Fka Twissleman I)
Solar
15.0 MWOperating Kern, CACAISO Mar 20112015
Wildwood Solar 2
Solar
15.0 MWOperating Kern, CACAISO Apr 20122017
Java Solar
Solar
13.5 MWOperating Kings, CACAISO Apr 20132022
Bear Canyon Energy Storage
Battery storage
13.3 MWOperating Lake, CACAISO Apr 20152024
Ox Mountain Landfill Gas Generation
Gas
12.6 MWOperating San Mateo, CACAISO Jun 20052009
Blue Lake Power
Other
11.0 MWOperating CACAISO Aug 20082010
Spi Sonora
Other
10.9 MWOperating Tuolumne, CACAISO May 20162018
Chowchilla Biomass
Other
10.5 MWOperating Madera, CACAISO Jul 20052009
El Nido
Other
10.5 MWOperating Merced, CACAISO Jul 20052009
Pio Pico Capacity Increase (Fka Pio Pico Energy Center 2)
Gas
10.0 MWOperating San Diego, CACAISO Apr 20142016
Western Antelope DRY Ranch
Solar
10.0 MWOperating Los Angeles, CACAISO Oct 20102016
Other project 54, Siskiyou County
Other · Roseburg Forest Products Inc.
10.0 MWOperating Siskiyou, CAWest Apr 2005target 2010
Ultrapower Chinese Station BESS
Battery storage
10.0 MWOperating Tuolumne, CACAISO Apr 2015target 2017
Skic Solar
Solar
10.0 MWOperating Kern, CACAISO Apr 20122017
Pearblossom Solar
Solar
9.5 MWOperating Los Angeles, CACAISO Apr 20132016
Tulloch Powerhouse
Hydro
7.2 MWOperating Tuolumne, CACAISO Jul 20092012
Wind Wall Monolith 1
Onshore wind
5.0 MWOperating CACAISO Apr 20182021
Calrenew-1(A)
Solar
5.0 MWOperating Fresno, CACAISO Oct 20072010
Re Garland
Solar
5.0 MWOperating Kern, CACAISO May 20202021
Hydro project 1055, Shasta County
Hydro · Slate Creek Hydro Associates LP
4.2 MWOperating Shasta, CAWest Jul 2018target 2020
Ameresco Butte County Landfill
Other
4.0 MWOperating Butte, CACAISO Feb 20092012
Wind Wall Monolith 2
Onshore wind
3.7 MWOperating Kern, CACAISO Apr 20182021
Vasco Wind Project
Onshore wind
3.1 MWOperating Contra Costa, CACAISO Mar 20112011
Chula Vista Energy Center Expansion
Gas
2.8 MWOperating San Diego, CACAISO Mar 20212022
Point Wind Fast Track
Onshore wind
1.6 MWOperating Kern, CACAISO Apr 20202021
Fresno Cogen Ice Unit
Gas
0.6 MWOperating Fresno, CACAISO Dec 20042006
Merced Power
Other
0.5 MWOperating Merced, CACAISO Mar 20142014
Hydro project 497, Siskiyou County
Hydro · Hayward Paul Luckey, Sr.
0.0 MWOperating Siskiyou, CAWest Jun 2013target 2014
Richmond Steam Turbine
Gas
0.0 MWOperating Contra Costa, CACAISO Apr 20142019
Page 5 of 5

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)