United States › Grid › Interconnection queues › California
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in California — page 4
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Etiwanda CCGT Gas |
698 MW | Withdrawn / abandoned |
| City Of Vernon Renewable Project 1 Onshore wind |
688 MW | Withdrawn / abandoned |
| Edison Drive Energy Storage Battery storage |
672 MW | Withdrawn / abandoned |
| Sunstone Solar + storage |
672 MW | Withdrawn / abandoned |
| Huxley Solar Solar + storage |
671 MW | Withdrawn / abandoned |
| Bryon Highway Power Bank Gas |
663 MW | Withdrawn / abandoned |
| Railway Power Bank Battery storage |
656 MW | Withdrawn / abandoned |
| McFarland D Solar + storage |
651 MW | Withdrawn / abandoned |
| Oakley Generating Station Gas |
651 MW | Withdrawn / abandoned |
| Ashanti Hybrid Solar Solar + storage |
650 MW | Withdrawn / abandoned |
| Morro Bay Wave Energy Project Other |
650 MW | Withdrawn / abandoned |
| Alta Q175 (Fka Alta 11) Onshore wind |
650 MW | Withdrawn / abandoned |
| Steel City Energy Storage Battery storage |
650 MW | Withdrawn / abandoned |
| Antioch Generating Station Gas |
650 MW | Withdrawn / abandoned |
| South Bay Replacement - Option 1 Gas |
650 MW | Withdrawn / abandoned |
| Ventus Renewable Energy Center Other |
643 MW | Withdrawn / abandoned |
| Blythe III (Revised) Gas |
640 MW | Withdrawn / abandoned |
| Pastoria Creek Power Bank Battery storage |
636 MW | Withdrawn / abandoned |
| Mojave Solar Park 1 Solar |
635 MW | Withdrawn / abandoned |
| Bluff Trail Storage Battery storage |
632 MW | Withdrawn / abandoned |
| Salton Solar Solar + storage |
632 MW | Withdrawn / abandoned |
| CPV California Ix Gas |
630 MW | Withdrawn / abandoned |
| CPV California Viii Gas |
630 MW | Withdrawn / abandoned |
| CPV California Vii Gas |
630 MW | Withdrawn / abandoned |
| CPV California VI Gas |
630 MW | Withdrawn / abandoned |
| Seaglass Offshore Wind Offshore wind |
629 MW | Withdrawn / abandoned |
| Pecho Energy Storage Other |
628 MW | Withdrawn / abandoned |
| Lion Rock Offshore Wind Offshore wind |
627 MW | Withdrawn / abandoned |
| Belmont Solar + storage |
627 MW | Withdrawn / abandoned |
| Birch Street Generation Facility (Fka Birch Street- Simple Cycle) Gas |
625 MW | Withdrawn / abandoned |
| Grand Ave Generation Facility (Fka Grand Ave Simple Cycle) Gas |
625 MW | Withdrawn / abandoned |
| Natura Other |
623 MW | Withdrawn / abandoned |
| Ventoso Other |
623 MW | Withdrawn / abandoned |
| Date Palm Battery storage |
621 MW | Withdrawn / abandoned |
| Avenal Energy Project Gas |
620 MW | Withdrawn / abandoned |
| Rainbow Energy Facility Gas |
620 MW | Withdrawn / abandoned |
| Astra Other |
620 MW | Withdrawn / abandoned |
| Fortuna Other |
620 MW | Withdrawn / abandoned |
| Valorem Other |
619 MW | Withdrawn / abandoned |
| Fort Tejon Solar Solar + storage |
617 MW | Withdrawn / abandoned |
| Fortis Other |
616 MW | Withdrawn / abandoned |
| Charger Storage Battery storage |
616 MW | Withdrawn / abandoned |
| Blue Oak Storage Battery storage |
616 MW | Withdrawn / abandoned |
| Resonate Solar + storage |
615 MW | Withdrawn / abandoned |
| Angel Energy Center Battery storage |
615 MW | Withdrawn / abandoned |
| Porta Other |
615 MW | Withdrawn / abandoned |
| Waller Solar Farm Solar + storage |
615 MW | Withdrawn / abandoned |
| Carson Hydrogen Power Project (CHPP) Gas |
614 MW | Withdrawn / abandoned |
| Osito Energy Solar + storage |
613 MW | Withdrawn / abandoned |
| Voltron Solar + storage |
612 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)