Requests shown429188.6 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

429 requests · page 4 of 9
ProjectCapacityStatusLocationRegionQueuedOnline
Solstice D
Solar + storage
408 MWIn study Fresno, CACAISO Apr 2023target 2031
Rough Hat 2
Solar + storage
408 MWAgreement signed Clark, NVCAISO Apr 2020target 2027
Clarkson
Solar + storage
408 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
Maravillosa 1
Solar + storage
407 MWIn study Kings, CACAISO Apr 2023target 2029
Lotus Solar 2
Solar + storage
406 MWIn study Madera, CACAISO Apr 2021target 2030
Simon
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Gabriel Storage
Battery storage
406 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2033
Trolley
Battery storage
406 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Coral Reef
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Fleetwood
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Marici
Battery storage
406 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2031
Tea Leaf Energy Storage
Battery storage
404 MWIn study Alameda, CACAISO Apr 2023target 2030
Rough Hat Hybrid Solar
Solar + storage
404 MWAgreement signed Nye, NVCAISO Apr 2019target 2028
Dirac
Battery storage
403 MWIn study San Bernardino, CACAISO Apr 2021target 2031
Mount Laguna Wind 2
Onshore wind
400 MWAgreement signed San Diego, CACAISO May 2017target 2031
Driftwood Stella
Solar + storage
400 MWAgreement signed Kern, CACAISO May 2017target 2026
Gamay
Solar + storage
400 MWIn study Kern, CACAISO Apr 2023target 2031
Aratina Solar Center 2
Solar + storage
400 MWAgreement signed Kern, CACAISO Apr 2019target 2026
Sequoia
Solar + storage
400 MWIn study Tulare, CACAISO Apr 2020target 2031
Brushy
Battery storage
400 MWIn study Solano, CACAISO Apr 2021target 2031
Rexford 2 Solar Farm
Solar + storage
400 MWAgreement signed Tulare, CACAISO Apr 2020target 2027
Aratina Solar Center 1
Solar + storage
400 MWAgreement signed San Bernardino, CACAISO Apr 2015target 2026
Sienna Solar Farm
Solar + storage
400 MWAgreement signed San Bernardino, CACAISO Apr 2015target 2027
White Wing Ranch Solar
Solar + storage
400 MWAgreement signed Yuma, AZCAISO Apr 2014target 2026
Water Rock Solar 1
Solar + storage
400 MWAgreement signed Nye, NVCAISO Apr 2020target 2027
Comstock
Gas
398 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Sonrisa
Solar + storage
384 MWAgreement signed Fresno, CACAISO May 2017target 2026
MidBishop
Solar + storage
382 MWIn study Kings, CACAISO Apr 2023target 2029
Brown Bear
Solar + storage
378 MWIn study Kings, CACAISO Apr 2023target 2029
Luna Valley Solar
Solar + storage
373 MWAgreement signed Fresno, CACAISO Apr 2015target 2028
Circinus
Solar + storage
371 MWIn study Merced, CACAISO Apr 2023target 2031
Golden Flats
Battery storage
365 MWAgreement signed Stanislaus, CACAISO Apr 2021target 2031
Espresso
Battery storage
365 MWAgreement signed Alameda, CACAISO Apr 2021target 2031
Northeast Central Valley
Battery storage
365 MWIn study San Joaquin, CACAISO Apr 2021target 2031
Jewelflower Storage
Battery storage
355 MWAgreement signed Santa Clara, CACAISO Apr 2019target 2029
Goldlink
Solar
354 MWIn study Nye, NVCAISO Apr 2023target 2030
Allegheny Energy Storage
Battery storage
353 MWAgreement signed Contra Costa, CACAISO Apr 2021target 2032
Bajada
Solar
353 MWIn study Riverside, CACAISO Apr 2023target 2030
Moonraker
Battery storage
353 MWIn study Kern, CACAISO Apr 2023target 2029
Zama
Battery storage
353 MWIn study Kern, CACAISO Apr 2023target 2029
Argos Solar
Solar
352 MWIn study San Bernardino, CACAISO Apr 2023target 2030
Dateland Energy Complex
Solar + storage
350 MWAgreement signed Yuma, AZCAISO Apr 2020target 2027
Dandelion Hybrid Solar
Solar + storage
334 MWIn study Nye, NVCAISO Apr 2021target 2027
Harquahala Sunrise 2
Solar + storage
330 MWIn study Maricopa, AZCAISO Apr 2021target 2026
Ariella Solar
Solar + storage
327 MWAgreement signed Tulare, CACAISO Apr 2021target 2030
Spikes Peak Solar
Solar + storage
318 MWAgreement signed Merced, CACAISO Apr 2021target 2029
Galadriel
Battery storage
318 MWIn study Madera, CACAISO Apr 2023target 2031
Quaking Aspen
Solar + storage
318 MWIn study Kern, CACAISO Apr 2023target 2029
Corby
Battery storage
314 MWAgreement signed Solano, CACAISO May 2016target 2027
Cargo Storage
Battery storage
313 MWIn study San Diego, CACAISO Apr 2021target 2036

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)