United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in the USA — page 361
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas Turbine (Additional Capacity) Other |
29.0 MW | Withdrawn / abandoned |
| Power Station Increase Nuclear |
29.0 MW | Withdrawn / abandoned |
| Solar project 303, Roane County Solar |
29.0 MW | Withdrawn / abandoned |
| Other project J065, Scott County Other |
29.0 MW | Withdrawn / abandoned |
| Mount Storm Unit 3 Coal |
29.0 MW | Withdrawn / abandoned |
| Madera Power Other |
29.0 MW | Withdrawn / abandoned |
| Solar project AG2-251, Trumbull County Solar |
29.0 MW | Withdrawn / abandoned |
| Fuel Cell Gas |
28.9 MW | Withdrawn / abandoned |
| EE Group @ Blandford Solar + storage |
28.9 MW | Withdrawn / abandoned |
| Solar project 920657, Davidson County Solar |
28.8 MW | Withdrawn / abandoned |
| Battery storage project AH1-231, New Kent County Battery storage |
28.8 MW | Withdrawn / abandoned |
| Solar project 963469, Davidson County Solar |
28.8 MW | Withdrawn / abandoned |
| Wind Onshore wind |
28.8 MW | Withdrawn / abandoned |
| CMP Lakewood 115 kV SS - Winslow-Lakewood Areas Study Solar |
28.7 MW | Withdrawn / abandoned |
| Medeiros Solar Solar |
28.4 MW | Withdrawn / abandoned |
| SHOAL POINT Steam Turbine Other · Fortescue |
28.4 MW | Withdrawn / abandoned |
| Sol Sienta Solar Solar · Sol Sienta Solar, LLC |
28.4 MW | Withdrawn / abandoned |
| Hydro Hydro |
28.3 MW | Withdrawn / abandoned |
| Other project 35, Payette County Other |
28.0 MW | Withdrawn / abandoned |
| Battery storage project AF2-308, Hardin County Battery storage |
28.0 MW | Withdrawn / abandoned |
| Wendall Depot Substation - NG WMA Group 3 Solar + storage |
28.0 MW | Withdrawn / abandoned |
| Gas project AB2-173, Lee County Gas |
28.0 MW | Withdrawn / abandoned |
| Egp Solar 1 Solar |
28.0 MW | Withdrawn / abandoned |
| Solar project AH1-530, Butler County Solar · Riverlake Energy, LLC |
28.0 MW | Withdrawn / abandoned |
| Other project J012, Crawford County Other |
28.0 MW | Withdrawn / abandoned |
| Other project 32, Cassia County Other |
28.0 MW | Withdrawn / abandoned |
| Other project 31, Minidoka County Other |
28.0 MW | Withdrawn / abandoned |
| Harbor Cogeneration Gas |
28.0 MW | Withdrawn / abandoned |
| Pine Grove WF Onshore wind |
28.0 MW | Withdrawn / abandoned |
| Other project 36, Gooding County Other |
28.0 MW | Withdrawn / abandoned |
| Other project 44, Cassia County Other |
28.0 MW | Withdrawn / abandoned |
| Other project 39, Gooding County Other |
28.0 MW | Withdrawn / abandoned |
| Onshore wind project S19, Schuylkill County Onshore wind |
28.0 MW | Withdrawn / abandoned |
| Geothermal project 231-A, Beaver County Geothermal |
28.0 MW | Withdrawn / abandoned |
| Solar project AG2-181, Dorchester County Solar · Old Line Energy, LLC |
28.0 MW | Withdrawn / abandoned |
| Other project 29, Twin Falls County Other |
28.0 MW | Withdrawn / abandoned |
| Trillium PV I Solar · Trillium PV I, LLC |
28.0 MW | Withdrawn / abandoned |
| Battery storage project AH2-261, Preston County Battery storage |
28.0 MW | Withdrawn / abandoned |
| Other project V3-064, Marion County Other |
28.0 MW | Withdrawn / abandoned |
| Solar project AG2-592, Dorchester County Solar |
28.0 MW | Withdrawn / abandoned |
| Other project 38, Jerome County Other |
28.0 MW | Withdrawn / abandoned |
| Other project G0394, Deschutes County Other |
28.0 MW | Withdrawn / abandoned |
| Other project 45, Ada County Other |
28.0 MW | Withdrawn / abandoned |
| Other project 34, Cassia County Other |
28.0 MW | Withdrawn / abandoned |
| Other project 30, Minidoka County Other |
28.0 MW | Withdrawn / abandoned |
| Other project 28, Minidoka County Other |
28.0 MW | Withdrawn / abandoned |
| Onshore wind project R59, Wright County Onshore wind |
28.0 MW | Withdrawn / abandoned |
| Battery storage project AH1-578, Wayne County Battery storage · Dragonfly Fields Solar Project, LLC |
28.0 MW | Withdrawn / abandoned |
| Other project 33, Cassia County Other |
28.0 MW | Withdrawn / abandoned |
| Other project 37, Gooding County Other |
28.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)