ONSHORE WIND Β· MISOOnshore wind project R59, Wright County
Onshore wind project R59, Wright County is a 28.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Wright County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2009 (completed)
- Withdrawn / abandonedJan 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R59
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Wall Lake (Century) - expansion
- Location
- Wright County, Iowa
- Technology
- Wind: 28.0 MW
- Total requested
- 28.0 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 8 April 2009
- Proposed online date
- June 2010
- Withdrawn
- January 2017
Location
Marker shows the centre of Wright County; the queue data does not give exact sites.