Withdrawn queue requests in CAISO (California) — page 23

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 23 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Lynchpin Solar
Solar + storage
165 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Harmony Storage 1
Battery storage
165 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2021target 2025
Slate Mountain Solar
Solar + storage
165 MWWithdrawn / abandoned Tulare, CACAISO Apr 2021target 2027
Lago Domingo Solar
Solar + storage
165 MWWithdrawn / abandoned San Diego, CACAISO Apr 2021target 2025
Tepona Off-Shore Wind
Offshore wind
162 MWWithdrawn / abandoned Humboldt, CACAISO Apr 2018target 2034
Elsa Hybrid
Solar + storage
160 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Hedionda Energy Storage
Battery storage
160 MWWithdrawn / abandoned San Diego, CACAISO Apr 2020target 2024
Gibson Canyon Hybrid
Solar + storage
160 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
SLW (Fka Shu'Luuk Wind)
Onshore wind
160 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2017
Alta Q97 (Fka Alta 5 And Lucchese)
Onshore wind
160 MWWithdrawn / abandoned Kern, CACAISO Mar 2006target 2016
Dupont Storage
Battery storage
159 MWWithdrawn / abandoned Ventura, CACAISO Apr 2021target 2025
Lenny Storage
Battery storage
159 MWWithdrawn / abandoned Alameda, CACAISO Apr 2021target 2025
West Springs Wind Farm
Onshore wind
158 MWWithdrawn / abandoned Riverside, CACAISO May 2016target 2021
Berryessa Wind Farm
Onshore wind
158 MWWithdrawn / abandoned Yolo, CACAISO May 2016target 2019
Surya Solar
Solar
158 MWWithdrawn / abandoned Kern, CACAISO May 2016target 2019
Capetown 3 Hybrid
Wind + storage
158 MWWithdrawn / abandoned Humboldt, CACAISO Apr 2020target 2023
Alamo Springs Solar 3
Solar
158 MWWithdrawn / abandoned Kern, CACAISO May 2016target 2019
Wilbur Power CC
Gas
158 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2005target 2008
Castle Rock Energy Storage
Battery storage
158 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2023target 2028
Grid Balance Energy Center
Battery storage
157 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Bernardo Energy Storage
Battery storage
157 MWWithdrawn / abandoned San Diego, CACAISO Apr 2021target 2025
Black Horse
Gas
157 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Steady Grid Energy Center
Battery storage
157 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Orchard Stand Energy Center
Battery storage
157 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Pastoria Expansion
Gas
157 MWWithdrawn / abandoned Kern, CACAISO Nov 2004target 2011
Orchard Grove Energy Center
Battery storage
157 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Old Steel Bridge BESS
Battery storage
157 MWWithdrawn / abandoned San Diego, CACAISO Apr 2021target 2025
Oxford
Solar + storage
157 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2023
Redpoint Hybrid
Solar + storage
157 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Cowboy Hybrid
Solar + storage
156 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Obispo Trail Energy Storage
Battery storage
156 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Callinan Solar 2
Solar + storage
156 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Kanoa Solar 2
Solar + storage
156 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Wistaria Solar 2
Solar
156 MWWithdrawn / abandoned Imperial, CACAISO May 2017target 2019
Oakland Es
Battery storage
156 MWWithdrawn / abandoned Alameda, CACAISO Apr 2015target 2021
American Kings 10
Solar
156 MWWithdrawn / abandoned Fresno, CACAISO May 2017target 2021
West Springs 2 Wind Farm
Onshore wind
155 MWWithdrawn / abandoned Riverside, CACAISO May 2017target 2023
Delta Oak
Battery storage
155 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Sun Streams Solar 3
Solar
155 MWWithdrawn / abandoned Maricopa, AZCAISO May 2017target 2020
Keynot Peak
Solar + storage
155 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Sagrario
Solar + storage
155 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2023
Periwinkle
Solar + storage
155 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
Legacy
Solar + storage
155 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2024
Quartzite 10
Solar
155 MWWithdrawn / abandoned Riverside, CACAISO May 2017target 2023
Hermes Energy Storage
Battery storage
155 MWWithdrawn / abandoned San Diego, CACAISO Apr 2021target 2024
Gibson
Battery storage
155 MWWithdrawn / abandoned Merced, CACAISO Apr 2023target 2028
Sunflower Storage
Battery storage
154 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Carroll Canyon Energy Storage
Battery storage
154 MWWithdrawn / abandoned San Diego, CACAISO Apr 2020target 2023
Panther Storage
Battery storage
154 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Ant
Solar + storage
154 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Page 23 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)