United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 23
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Lynchpin Solar Solar + storage |
165 MW | Withdrawn / abandoned |
| Harmony Storage 1 Battery storage |
165 MW | Withdrawn / abandoned |
| Slate Mountain Solar Solar + storage |
165 MW | Withdrawn / abandoned |
| Lago Domingo Solar Solar + storage |
165 MW | Withdrawn / abandoned |
| Tepona Off-Shore Wind Offshore wind |
162 MW | Withdrawn / abandoned |
| Elsa Hybrid Solar + storage |
160 MW | Withdrawn / abandoned |
| Hedionda Energy Storage Battery storage |
160 MW | Withdrawn / abandoned |
| Gibson Canyon Hybrid Solar + storage |
160 MW | Withdrawn / abandoned |
| SLW (Fka Shu'Luuk Wind) Onshore wind |
160 MW | Withdrawn / abandoned |
| Alta Q97 (Fka Alta 5 And Lucchese) Onshore wind |
160 MW | Withdrawn / abandoned |
| Dupont Storage Battery storage |
159 MW | Withdrawn / abandoned |
| Lenny Storage Battery storage |
159 MW | Withdrawn / abandoned |
| West Springs Wind Farm Onshore wind |
158 MW | Withdrawn / abandoned |
| Berryessa Wind Farm Onshore wind |
158 MW | Withdrawn / abandoned |
| Surya Solar Solar |
158 MW | Withdrawn / abandoned |
| Capetown 3 Hybrid Wind + storage |
158 MW | Withdrawn / abandoned |
| Alamo Springs Solar 3 Solar |
158 MW | Withdrawn / abandoned |
| Wilbur Power CC Gas |
158 MW | Withdrawn / abandoned |
| Castle Rock Energy Storage Battery storage |
158 MW | Withdrawn / abandoned |
| Grid Balance Energy Center Battery storage |
157 MW | Withdrawn / abandoned |
| Bernardo Energy Storage Battery storage |
157 MW | Withdrawn / abandoned |
| Black Horse Gas |
157 MW | Withdrawn / abandoned |
| Steady Grid Energy Center Battery storage |
157 MW | Withdrawn / abandoned |
| Orchard Stand Energy Center Battery storage |
157 MW | Withdrawn / abandoned |
| Pastoria Expansion Gas |
157 MW | Withdrawn / abandoned |
| Orchard Grove Energy Center Battery storage |
157 MW | Withdrawn / abandoned |
| Old Steel Bridge BESS Battery storage |
157 MW | Withdrawn / abandoned |
| Oxford Solar + storage |
157 MW | Withdrawn / abandoned |
| Redpoint Hybrid Solar + storage |
157 MW | Withdrawn / abandoned |
| Cowboy Hybrid Solar + storage |
156 MW | Withdrawn / abandoned |
| Obispo Trail Energy Storage Battery storage |
156 MW | Withdrawn / abandoned |
| Callinan Solar 2 Solar + storage |
156 MW | Withdrawn / abandoned |
| Kanoa Solar 2 Solar + storage |
156 MW | Withdrawn / abandoned |
| Wistaria Solar 2 Solar |
156 MW | Withdrawn / abandoned |
| Oakland Es Battery storage |
156 MW | Withdrawn / abandoned |
| American Kings 10 Solar |
156 MW | Withdrawn / abandoned |
| West Springs 2 Wind Farm Onshore wind |
155 MW | Withdrawn / abandoned |
| Delta Oak Battery storage |
155 MW | Withdrawn / abandoned |
| Sun Streams Solar 3 Solar |
155 MW | Withdrawn / abandoned |
| Keynot Peak Solar + storage |
155 MW | Withdrawn / abandoned |
| Sagrario Solar + storage |
155 MW | Withdrawn / abandoned |
| Periwinkle Solar + storage |
155 MW | Withdrawn / abandoned |
| Legacy Solar + storage |
155 MW | Withdrawn / abandoned |
| Quartzite 10 Solar |
155 MW | Withdrawn / abandoned |
| Hermes Energy Storage Battery storage |
155 MW | Withdrawn / abandoned |
| Gibson Battery storage |
155 MW | Withdrawn / abandoned |
| Sunflower Storage Battery storage |
154 MW | Withdrawn / abandoned |
| Carroll Canyon Energy Storage Battery storage |
154 MW | Withdrawn / abandoned |
| Panther Storage Battery storage |
154 MW | Withdrawn / abandoned |
| Ant Solar + storage |
154 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)