Legacy is a 155 MW solar + storage request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedNov 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1999
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Wheeler Ridge-Tejon 70 kV Line
Location
Kern County, California
Technology
Solar: 102 MW Β· Battery: 52.9 MW
Total requested
155 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
December 2024
Withdrawn
November 2022

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.