United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 22

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 22 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
WP Walnut
Gas
200 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2013target 2017
Westlands Solar PV I
Solar
200 MWWithdrawn / abandoned Fresno, CACAISO Jul 2010target 2014
Primavera Storage
Battery storage
200 MWWithdrawn / abandoned San Diego, CACAISO Apr 2019target 2023
Firebaugh Solar - C5
Solar
200 MWWithdrawn / abandoned Fresno, CACAISO Apr 2012target 2015
Laguna Solar Farm
Solar
200 MWWithdrawn / abandoned Fresno, CACAISO Jul 2010target 2014
Pearl Geothermal
Geothermal
200 MWWithdrawn / abandoned Esmeralda, NVCAISO Apr 2021target 2027
Sun Valley Energy Center-1
Solar
200 MWWithdrawn / abandoned Maricopa, AZCAISO Nov 2011target 2016
Nyquist Storage
Battery storage
200 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Sergio Storage
Battery storage
199 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Big Bear Wind
Onshore wind
199 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2018target 2022
Madrone
Gas
199 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Boulevardier
Battery storage
199 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Camp Rock Wind
Onshore wind
199 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2007target 2013
Calico Mountains Wind Energy
Onshore wind
199 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2007target 2013
Cavalcade Storage
Battery storage
198 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Kingman Storage
Battery storage
198 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Cherryblossom Hybrid Solar
Solar + storage
197 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2021target 2024
Keyhole 3
Battery storage
193 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Saavi Imperial Energy Storage
Battery storage
192 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Pistachio Energy Park
Solar + storage
191 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2020
Wellhead Power Otay Mesa
Gas
190 MWWithdrawn / abandoned San Diego, CACAISO Jul 2009target 2013
West Valley Energy Center
Gas
188 MWWithdrawn / abandoned Fresno, CACAISO May 2008target 2011
Hudson Solar 1
Solar + storage
186 MWWithdrawn / abandoned Fresno, CACAISO May 2016target 2024
Darlington Balley Solar Energy 1
Solar + storage
185 MWWithdrawn / abandoned Maricopa, AZCAISO May 2017target 2024
Poppy
Solar
185 MWWithdrawn / abandoned Fresno, CACAISO Apr 2019target 2022
Corcair Hybrid Solar
Solar + storage
181 MWWithdrawn / abandoned Kings, CACAISO Apr 2019target 2022
Meadow Ridge 2
Solar + storage
181 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Copper Rays Solar
Solar
180 MWWithdrawn / abandoned Nye, NVCAISO Apr 2012target 2013
Alta Q94 (Fka Lehigh)
Onshore wind
180 MWWithdrawn / abandoned Kern, CACAISO Mar 2006target 2016
Desert Wind
Onshore wind
180 MWWithdrawn / abandoned San Bernardino, CACAISO May 2007target 2010
Townsite Solar Project
Solar
180 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Munz Solar 1
Solar + storage
180 MWWithdrawn / abandoned Los Angeles, CACAISO May 2017target 2020
Littlejohns Energy Center
Solar + storage
179 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Bobcat
Battery storage
179 MWWithdrawn / abandoned CACAISO Apr 2021target 2024
Bulldog Storage
Battery storage
178 MWWithdrawn / abandoned Fresno, CACAISO Apr 2021target 2025
Delta Solano Wind
Onshore wind
175 MWWithdrawn / abandoned Solano, CACAISO Apr 2012target 2015
Yorktown
Solar + storage
175 MWWithdrawn / abandoned Kings, CACAISO Apr 2021target 2029
Bodega Bay Project
Onshore wind
175 MWWithdrawn / abandoned Marin, CACAISO Jun 2007target 2010
Chickaree Hybrid Solar
Solar + storage
173 MWWithdrawn / abandoned Butte, CACAISO Apr 2020target 2023
Owl Claw Hybrid Solar
Solar + storage
173 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2020target 2023
Lopez BESS
Battery storage
172 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2033
Saltgrass
Battery storage
171 MWWithdrawn / abandoned Stanislaus, CACAISO Apr 2023target 2028
Noble Well Wind Generation Project
Onshore wind
170 MWWithdrawn / abandoned San Bernardino, CACAISO May 2007target 2010
Blythe Solar PV I
Solar
170 MWWithdrawn / abandoned Riverside, CACAISO Feb 2010target 2012
Loma Verde Solar Energy Park
Solar
170 MWWithdrawn / abandoned Riverside, CACAISO Jul 2010target 2014
Wre - Stroud
Other
169 MWWithdrawn / abandoned Fresno, CACAISO Jul 2010target 2017
Albion P3
Gas
169 MWWithdrawn / abandoned San Joaquin, CACAISO Nov 2004target 2007
High Desert View Solar
Solar + storage
168 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2015target 2019
High Desert View Solar Project
Solar + storage
167 MWWithdrawn / abandoned San Bernardino, CACAISO May 2016target 2020
Wellhead Power Humboldt
Gas
167 MWWithdrawn / abandoned Humboldt, CACAISO Apr 2005target 2007
Page 22 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)