United States › Grid › Interconnection queues › California
SOLAR + STORAGE · CAISOCorcair Hybrid Solar
Corcair Hybrid Solar is a 181 MW solar + storage request withdrawn in the CAISO interconnection queue, in Kings County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedJul 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1583
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Waukena Substation 115kV
- Location
- Kings County, California
- Technology
- Solar: 91.4 MW · Battery: 90.0 MW
- Total requested
- 181 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 15 April 2019
- Proposed online date
- November 2022
- Withdrawn
- July 2019
Location
Marker shows the centre of Kings County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Kings County
- Pelicans Jaw Hybrid SolarSolar + storage · 1,000 MW · agreement signed
- DaylightSolar + storage · 611 MW · agreement signed
- PluotSolar + storage · 479 MW · agreement signed
- PomegranateSolar + storage · 479 MW · agreement signed
- American Kings SolarSolar + storage · 197 MW · agreement signed
- Kettleman Solar Project (Fka Kettleman Solar Farm)Solar + storage · 40.0 MW · agreement signed
- RippleSolar + storage · 1,880 MW · in study
- PlumSolar + storage · 1,560 MW · in study
- Valley Sunlight RefinerySolar + storage · 821 MW · in study
- SunglowSolar + storage · 744 MW · in study
- Blue StarSolar + storage · 513 MW · in study
- Maravillosa 1Solar + storage · 407 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem