United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Cherryblossom Hybrid Solar

Cherryblossom Hybrid Solar is a 197 MW solar + storage request withdrawn in the CAISO interconnection queue, in San Luis Obispo County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedJan 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2016
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Solar Switching Station 230 kV
Location
San Luis Obispo County, California
Technology
Solar: 131 MW · Battery: 65.5 MW
Total requested
197 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
November 2024
Withdrawn
January 2023

Location

Marker shows the centre of San Luis Obispo County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Luis Obispo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem