🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

Alta Q94 (Fka Lehigh)

Alta Q94 (Fka Lehigh) is a 180 MW onshore wind request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2006 (completed)
  2. Withdrawn / abandonedFeb 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
94
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Highwind Sub 220kV Bus
Location
Kern County, California
Technology
Wind: 180 MW
Total requested
180 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 March 2006
Proposed online date
December 2016
Withdrawn
February 2014

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Kern County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem