United States β€Ί Grid β€Ί Interconnection queues β€Ί Nevada

GEOTHERMAL Β· CAISO

Pearl Geothermal

Pearl Geothermal is a 200 MW geothermal request withdrawn in the CAISO interconnection queue, in Esmeralda County, Nevada, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedJan 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2106
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Control Substation 115 kV
Location
Esmeralda County, Nevada
Technology
Geothermal: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
September 2027
Withdrawn
January 2023

Location

Marker shows the centre of Esmeralda County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Esmeralda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem