United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR + STORAGE Β· CAISO

Yorktown

Yorktown is a 175 MW solar + storage request withdrawn in the CAISO interconnection queue, in Kings County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedJul 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1969
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Corcoran 70 kV
Location
Kings County, California
Technology
Solar: 87.5 MW Β· Battery: 87.5 MW
Total requested
175 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
December 2029
Withdrawn
July 2024

Location

Marker shows the centre of Kings County; the queue data does not give exact sites.