Owl Claw Hybrid Solar

Owl Claw Hybrid Solar is a 173 MW solar + storage request withdrawn in the CAISO interconnection queue, in San Joaquin County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedJun 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1707
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Camanche 115kV Tap via the Camanche Powerhouse Station 115kV
Location
San Joaquin County, California
Technology
Solar: 86.6 MW · Battery: 86.6 MW
Total requested
173 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
December 2023
Withdrawn
June 2020

Location

Marker shows the centre of San Joaquin County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Joaquin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem