United States โบ Grid โบ Interconnection queues
OCTARY USA ยท INTERCONNECTION QUEUESQueue requests in study in the USA (2021 requests) โ page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project Q387, Navajo County Solar + storage |
588 MW | In study |
| Other project 110, Garfield County Other |
560 MW | In study |
| Solar + storage project Company LW, Mineral County Solar + storage |
550 MW | Paused / redesign |
| Solar + storage project Q85, Juab County Solar + storage ยท Intermountain Power Agency |
550 MW | In study |
| Sagebrush Energy Storage Battery storage |
528 MW | In study |
| Rosa Storage Battery storage |
512 MW | In study |
| Solar project GEN-2021-030, Linn County Solar |
510 MW | In study |
| Bayside Solar Solar |
509 MW | Paused / redesign |
| Dovetail Storage Solar + storage ยท Hecate Energy Dovetail Storage LLC |
509 MW | In study |
| Outpost Storage Solar + storage ยท Hecate Energy Outpost Storage LLC |
508 MW | In study |
| Onshore wind project GEN-2021-070, Hodgeman County Onshore wind |
504 MW | In study |
| Harley Hand Storage Solar + storage ยท Hecate Energy Harley Hand Solar LLC |
503 MW | In study |
| Sterling Solar + storage |
500 MW | In study |
| Solar + storage project Q29, Maricopa County Solar + storage |
500 MW | In study |
| Solar + storage project Company ME, Lyon County Solar + storage |
500 MW | Paused / redesign |
| Solar + storage project J1897, Mississippi County Solar + storage |
500 MW | In study |
| Solar + storage project J1899, Mississippi County Solar + storage |
500 MW | In study |
| Solar + storage project G0668, Grant County Solar + storage |
500 MW | In study |
| Onshore wind project NC5-008, Mohave County Onshore wind |
500 MW | In study |
| Solar + storage project LGE-GIS-2021-008, Clark County Solar + storage |
500 MW | Paused / redesign |
| Solar + storage project Q393, Coconino County Solar + storage |
500 MW | In study |
| Solar project GEN-2021-096, Coffey County Solar |
500 MW | In study |
| Solar + storage project Q368, Yuma County Solar + storage |
500 MW | In study |
| Solar + storage project J2190, Mississippi County Solar + storage |
500 MW | In study |
| Solar project J1855, Jackson County Solar |
500 MW | In study |
| Battery storage project Q84, San Bernardino County Battery storage |
500 MW | In study |
| Offshore Wind Inc. (Q806) Offshore wind |
487 MW | In study |
| Corby 2 Battery storage |
476 MW | In study |
| Solar + storage project 2021-G4, Pinal County Solar + storage |
463 MW | In study |
| Calpine Guadalupe Peakers Gas ยท Guadalupe Peaking Energy Center, LLC |
450 MW | In study |
| Solar project G0712, Sherman County Solar |
448 MW | In study |
| Solar project J1858, Mississippi County Solar |
440 MW | In study |
| Poco Trail Solar Solar ยท Eastern Trail Solar Center, LLC |
439 MW | In study |
| Mineral King Solar Solar + storage |
430 MW | In study |
| Boulder Brush Hybrid Wind + storage |
420 MW | In study |
| Tolenas Battery storage |
417 MW | In study |
| Alisa Solar Energy Complex Solar + storage |
417 MW | In study |
| BRP Artemis BESS Battery storage ยท BRP Artemis BESS LLC |
411 MW | In study |
| BRP Snowdon BESS Battery storage ยท BRP SNOWDON BESS LLC |
411 MW | In study |
| BRP Mekong BESS Battery storage ยท BRP Mekong BESS LLC |
410 MW | In study |
| Beacon Storage Battery storage ยท AES Distributed Energy, Inc |
409 MW | In study |
| Sigma Storage Battery storage ยท AES Distributed Energy, Inc |
408 MW | In study |
| Grasshopper Solar Solar ยท Grasshopper Solar LLC |
408 MW | In study |
| Lotus Solar 2 Solar + storage |
406 MW | In study |
| Simon Battery storage |
406 MW | In study |
| Coral Reef Battery storage |
406 MW | In study |
| Fleetwood Battery storage |
406 MW | In study |
| Dirac Battery storage |
403 MW | In study |
| Merope BESS Battery storage ยท BRP Merope BESS LLC |
402 MW | In study |
| Solar project J2268, Linn County Solar |
400 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)172 ยท 56.8 GW
- CAISO (California)70 ยท 31.5 GW
- ERCOT (Texas)116 ยท 23.2 GW
- MISO (Midcontinent)126 ยท 22.4 GW
- Southeast (non-ISO utilities)44 ยท 9,966 MW
- SPP (Southwest Power Pool)25 ยท 5,570 MW
- PJM (Mid-Atlantic, Midwest)49 ยท 2,072 MW
- NYISO (New York)11 ยท 991 MW
- ISO-NE (New England)3 ยท 525 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)