OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in California — page 19
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Castleberry Battery storage |
205 MW | Withdrawn / abandoned |
| Calpeak Border Om 2 Gas |
205 MW | Withdrawn / abandoned |
| Songbird BESS Battery storage |
205 MW | Withdrawn / abandoned |
| Melon Patch Solar Solar + storage |
205 MW | Withdrawn / abandoned |
| Foxglove Hybrid Solar Solar + storage |
205 MW | Withdrawn / abandoned |
| Grand BESS Battery storage |
205 MW | Withdrawn / abandoned |
| Torana Hybrid Solar Solar + storage |
205 MW | Withdrawn / abandoned |
| Chardonnay Storage Center Battery storage |
205 MW | Withdrawn / abandoned |
| Montrose Storage Battery storage |
205 MW | Withdrawn / abandoned |
| Sagitta Battery storage |
205 MW | Withdrawn / abandoned |
| Sullivan Energy Center Solar + storage |
205 MW | Withdrawn / abandoned |
| Las Pilas Battery storage |
205 MW | Withdrawn / abandoned |
| Michelangelo Battery storage |
205 MW | Withdrawn / abandoned |
| Storybook Battery storage |
204 MW | Withdrawn / abandoned |
| Green Mezzo Battery storage |
204 MW | Withdrawn / abandoned |
| Rowan Solar + storage |
204 MW | Withdrawn / abandoned |
| Valley Green Battery storage |
204 MW | Withdrawn / abandoned |
| Airfield Solar + storage |
204 MW | Withdrawn / abandoned |
| Thunder Solar + storage |
204 MW | Withdrawn / abandoned |
| Double Butte 2 Battery storage |
204 MW | Withdrawn / abandoned |
| Barbaro Storage Battery storage |
204 MW | Withdrawn / abandoned |
| Respire Solar + storage |
204 MW | Withdrawn / abandoned |
| Plumb Solar + storage |
204 MW | Withdrawn / abandoned |
| Romero Creek Solar Solar |
204 MW | Withdrawn / abandoned |
| Hudson Solar 2 Solar + storage |
204 MW | Withdrawn / abandoned |
| Vermillion Energy Storage Battery storage |
204 MW | Withdrawn / abandoned |
| LH Energy Storage Battery storage |
204 MW | Withdrawn / abandoned |
| Austin Es Battery storage |
204 MW | Withdrawn / abandoned |
| Spindrift Hybrid Solar Solar + storage |
204 MW | Withdrawn / abandoned |
| Ellis BESS Battery storage |
203 MW | Withdrawn / abandoned |
| Ibra Storage Battery storage |
203 MW | Withdrawn / abandoned |
| Ronaldo Storage Battery storage |
203 MW | Withdrawn / abandoned |
| Seis Puntos Solar Solar |
203 MW | Withdrawn / abandoned |
| Sargasso Storage Battery storage |
203 MW | Withdrawn / abandoned |
| Salix Solar + storage |
202 MW | Withdrawn / abandoned |
| Hydrus Energy Storage Battery storage |
202 MW | Withdrawn / abandoned |
| Taurus Energy Storage Battery storage |
202 MW | Withdrawn / abandoned |
| Lanyard Energy Storage Battery storage |
202 MW | Withdrawn / abandoned |
| Honey Bear Solar + storage |
201 MW | Withdrawn / abandoned |
| Daggett Wind Project II Onshore wind |
201 MW | Withdrawn / abandoned |
| Oso Negro Solar + storage |
201 MW | Withdrawn / abandoned |
| Horse Lake Wind Project Onshore wind |
201 MW | Withdrawn / abandoned |
| Barren Ridge Wind Project Onshore wind |
201 MW | Withdrawn / abandoned |
| Geysers Wind Project Onshore wind |
201 MW | Withdrawn / abandoned |
| Frazier Lake Solar + storage |
201 MW | Withdrawn / abandoned |
| Bullard Energy Center Gas |
201 MW | Withdrawn / abandoned |
| Vanguard Solar BESS Solar + storage |
200 MW | Withdrawn / abandoned |
| Onshore wind project Q22, San Bernardino County Onshore wind |
200 MW | Withdrawn / abandoned |
| Blue SKY Wind Energy Center Onshore wind |
200 MW | Withdrawn / abandoned |
| Lukrich Energy Center Battery storage |
200 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)