United States › Grid › Interconnection queues › California
BATTERY STORAGE · CAISOValley Green
Valley Green is a 204 MW battery storage request withdrawn in the CAISO interconnection queue, in Santa Cruz County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedJan 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1926
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Green Valley Substation 115 kV
- Location
- Santa Cruz County, California
- Technology
- Battery: 204 MW
- Total requested
- 204 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 15 April 2021
- Proposed online date
- September 2024
- Withdrawn
- January 2023
Location
Marker shows the centre of Santa Cruz County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Santa Cruz County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem