🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Valley Green

Valley Green is a 204 MW battery storage request withdrawn in the CAISO interconnection queue, in Santa Cruz County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedJan 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1926
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Green Valley Substation 115 kV
Location
Santa Cruz County, California
Technology
Battery: 204 MW
Total requested
204 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
September 2024
Withdrawn
January 2023

Location

Marker shows the centre of Santa Cruz County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Santa Cruz County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem