United States › Grid › Interconnection queues › California
SOLAR + STORAGE · CAISOTorana Hybrid Solar
Torana Hybrid Solar is a 205 MW solar + storage request withdrawn in the CAISO interconnection queue, in Merced County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1726
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Los Banos Substation 70kV
- Location
- Merced County, California
- Technology
- Solar: 103 MW · Battery: 103 MW
- Total requested
- 205 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 15 April 2020
- Proposed online date
- December 2023
- Withdrawn
- March 2021
Location
Marker shows the centre of Merced County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Merced County
- Wingtip Solar 1Solar + storage · 2,352 MW · agreement signed
- AustralisSolar + storage · 614 MW · agreement signed
- Spikes Peak SolarSolar + storage · 318 MW · agreement signed
- Wright SolarSolar + storage · 280 MW · agreement signed
- Cougar StorageBattery storage · 204 MW · agreement signed
- Las Camas 3Solar + storage · 203 MW · agreement signed
- Las Camas 1Solar + storage · 203 MW · agreement signed
- ZetaSolar + storage · 155 MW · agreement signed
- Gonzaga HybridWind + storage · 115 MW · agreement signed
- Gonzaga Wind FarmOnshore wind · 80.0 MW · agreement signed
- Carissalito CreekSolar + storage · 832 MW · in study
- CantusSolar + storage · 499 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem