Torana Hybrid Solar

Torana Hybrid Solar is a 205 MW solar + storage request withdrawn in the CAISO interconnection queue, in Merced County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedMar 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1726
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Los Banos Substation 70kV
Location
Merced County, California
Technology
Solar: 103 MW · Battery: 103 MW
Total requested
205 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
December 2023
Withdrawn
March 2021

Location

Marker shows the centre of Merced County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Merced County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem