United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 126
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project AI2-013, Grundy County Solar |
24.1 MW | In study |
| Nuclear project 637, Hamilton County Nuclear |
24.0 MW | In study |
| Solar project AI2-154, Centre County Solar |
24.0 MW | In study |
| Hydro project 655, Hamilton County Hydro |
24.0 MW | In study |
| Hydro project 654, Hamilton County Hydro |
24.0 MW | In study |
| Solar project AI2-135, Mclean County Solar |
24.0 MW | In study |
| Gas project AH1-719, Washington County Gas · Washington Power Generation LLC |
24.0 MW | In study |
| Gas project AH1-686, Lawrence County Gas · Hanging Rock Power Company LLC |
24.0 MW | In study |
| Solar project AI2-169, Cass County Solar |
24.0 MW | In study |
| Solar project AI2-418, Allen County Solar |
24.0 MW | In study |
| Gas project AH1-704, Monroe County Gas · Long Ridge Energy Generation LLC |
24.0 MW | In study |
| Solar + storage project T2-088, Lake County Solar + storage |
23.5 MW | In study |
| Solar project J1927, Muscatine County Solar |
23.4 MW | In study |
| CPS Energy AvR1CT2 Rotor Replacement Gas · CPS Energy |
23.2 MW | In study |
| Solar project AI2-340, Van Buren County Solar |
23.1 MW | In study |
| Gas project 20211104002, Calhoun County Gas · DESC - Generation |
23.0 MW | In study |
| Solar project AI2-341, Marion County Solar |
22.8 MW | In study |
| Brazos Wind Repower Onshore wind · BRAZOS WIND VENTURES, LLC |
22.4 MW | In study |
| Solar project LGE-GIS-2024-004, Mercer County Solar |
22.0 MW | In study |
| Other project 977788, Columbus County Other |
22.0 MW | In study |
| Solar project J3993, Wayne County Solar |
21.4 MW | In study |
| Nuclear project J4010, Dewitt County Nuclear |
21.0 MW | In study |
| Brandon Gas |
21.0 MW | Paused / redesign |
| Surplus; G291 Other |
21.0 MW | In study |
| Solar project AH1-059, Knox County Solar · Frasier Solar, LLC |
21.0 MW | In study |
| Solar project AI2-374, Bath County Solar |
20.6 MW | In study |
| Solar project AI2-415, Butler County Solar |
20.3 MW | In study |
| Replacing 20 MW of solar with storage; J1746 Other |
20.2 MW | In study |
| Somers Solar, LLC Solar · Somers Solar, LLC |
20.0 MW | In study |
| Solar + storage project T2-042, Millard County Solar + storage |
20.0 MW | In study |
| Concho Solar I Solar |
20.0 MW | Paused / redesign |
| Coal project GI-40, New Madrid County Coal |
20.0 MW | In study |
| Battery storage project G0734, Benton County Battery storage |
20.0 MW | In study |
| Momentum Gratz Battery storage |
20.0 MW | Paused / redesign |
| SunEast Skyline Solar LLC Solar · SunEast Skyline Solar LLC |
20.0 MW | In study |
| Cedar Creek Solar Solar |
20.0 MW | Paused / redesign |
| SunEast Flat Stone Solar LLC Solar · SED NY Holdings LLC |
20.0 MW | In study |
| Solar + storage project T2-006, Tooele County Solar + storage · PacifiCorp |
20.0 MW | In study |
| Little Pond Solar Solar · Little Pond Solar, LLC |
20.0 MW | In study |
| Battery storage project AG2-380, Queen Anne's County Battery storage · Concho Solar I, LLC |
20.0 MW | In study |
| Solar + storage project T2-009, Umatilla County Solar + storage |
20.0 MW | In study |
| Geothermal project Company RA, Pershing County Geothermal |
20.0 MW | In study |
| Hills Solar Solar · SunEast Hills Solar LLC |
20.0 MW | In study |
| Battery storage project AH2-049, Somerset County Battery storage |
20.0 MW | In study |
| Mountain Holly Solar |
20.0 MW | Paused / redesign |
| Solar + storage project AI1-153, Dauphin County Solar + storage |
20.0 MW | In study |
| Hatchery Solar Solar · Hatchery Solar LLC |
20.0 MW | In study |
| Battery storage project AH2-048, Northampton County Battery storage |
20.0 MW | In study |
| Solar + storage project 340, Yellowstone County Solar + storage |
20.0 MW | In study |
| Solar project AH1-571 Solar · South Fork Solar, LLC |
20.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)