United States βΊ Grid βΊ Interconnection queues
OTHER Β· MISOSurplus; G291
Surplus; G291 is a 21.0 MW other request in interconnection study in the MISO interconnection queue, connecting to OTTER TAIL POWER COMPANY.
Queue statusIn planning
- PlanningQueued Sep 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Nov 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- S1064
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- OTTER TAIL POWER COMPANY
- Connection point (POI)
- EDGE SS9 41.6 kV
- Technology
- Other: 21.0 MW Β· Battery
- Total requested
- 21.0 MW
- Queue status
- Active
- Entered queue
- 6 September 2024
- Proposed online date
- November 2026
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem