United States › Grid › Interconnection queues › Iowa
SOLAR · MISOSolar project J1927, Muscatine County
Solar project J1927, Muscatine County is a 23.4 MW solar request in interconnection study in the MISO interconnection queue, in Muscatine County, Iowa, connecting to MUSCATINE POWER AND WATER.
Queue statusIn planning
- PlanningQueued Dec 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Aug 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J1927
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MUSCATINE POWER AND WATER
- Connection point (POI)
- Grandview Substation 69 kV
- Location
- Muscatine County, Iowa
- Technology
- Solar: 23.4 MW
- Total requested
- 23.4 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 3 December 2021
- Proposed online date
- August 2027
Location
Marker shows the centre of Muscatine County; the queue data does not give exact sites.
Other requests in Muscatine County
- Solar project J1218, Muscatine CountySolar · 200 MW · agreement signed
- Battery storage project J1229, Muscatine CountyBattery storage · 50.0 MW · agreement signed
- Solar project J3461, Muscatine CountySolar · 156 MW · in study
- Onshore wind project J2686, Muscatine CountyOnshore wind · 150 MW · in study
- Other project G355, Muscatine CountyOther · 6.0 MW · built
- Other project G187, Muscatine CountyOther · 600 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem