United States › Grid › Interconnection queues › Iowa

ONSHORE WIND · MISO

Onshore wind project J2686, Muscatine County

Onshore wind project J2686, Muscatine County is a 150 MW onshore wind request in interconnection study in the MISO interconnection queue, in Muscatine County, Iowa, connecting to MIDAMERICAN ENERGY CO..

Queue statusIn planning
  1. PlanningQueued Sep 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
J2686
Grid region
MISO (Midcontinent)
Utility / transmission owner
MIDAMERICAN ENERGY CO.
Connection point (POI)
Walcott 345 kV
Location
Muscatine County, Iowa
Technology
Wind: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Active
Entered queue
15 September 2022
Proposed online date
September 2026

Location

Marker shows the centre of Muscatine County; the queue data does not give exact sites.

Power plants in Iowa · Transmission lines in Iowa

Other requests in Muscatine County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem