ONSHORE WIND · MISOOnshore wind project J2686, Muscatine County
Onshore wind project J2686, Muscatine County is a 150 MW onshore wind request in interconnection study in the MISO interconnection queue, in Muscatine County, Iowa, connecting to MIDAMERICAN ENERGY CO..
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2686
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MIDAMERICAN ENERGY CO.
- Connection point (POI)
- Walcott 345 kV
- Location
- Muscatine County, Iowa
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- September 2026
Location
Marker shows the centre of Muscatine County; the queue data does not give exact sites.
Other requests in Muscatine County
- Solar project J1218, Muscatine CountySolar · 200 MW · agreement signed
- Battery storage project J1229, Muscatine CountyBattery storage · 50.0 MW · agreement signed
- Solar project J3461, Muscatine CountySolar · 156 MW · in study
- Solar project J1927, Muscatine CountySolar · 23.4 MW · in study
- Other project G355, Muscatine CountyOther · 6.0 MW · built
- Other project G187, Muscatine CountyOther · 600 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem