United States βΊ Grid βΊ Interconnection queues βΊ Iowa
OTHER Β· MISOOther project G187, Muscatine County
Other project G187, Muscatine County is a 600 MW other request withdrawn in the MISO interconnection queue, in Muscatine County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2002 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G187
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Muscatine County, Iowa
- Technology
- Other: 600 MW
- Total requested
- 600 MW
- Queue status
- Withdrawn
- Entered queue
- 1 April 2002
- Proposed online date
- November 2003
Location
Marker shows the centre of Muscatine County; the queue data does not give exact sites.
Other requests in Muscatine County
- Solar project J1218, Muscatine CountySolar Β· 200 MW Β· agreement signed
- Battery storage project J1229, Muscatine CountyBattery storage Β· 50.0 MW Β· agreement signed
- Solar project J3461, Muscatine CountySolar Β· 156 MW Β· in study
- Onshore wind project J2686, Muscatine CountyOnshore wind Β· 150 MW Β· in study
- Solar project J1927, Muscatine CountySolar Β· 23.4 MW Β· in study
- Other project G355, Muscatine CountyOther Β· 6.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem