United States › Grid › Interconnection queues › New York
SOLAR · NYISOLittle Pond Solar
Little Pond Solar is a 20.0 MW solar request in interconnection study in the NYISO interconnection queue, in Orange County, New York, connecting to O&R.
Queue statusIn planning
- PlanningQueued Sep 2016 (current stage)
- ConsentedJan 2021 (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 575
- Grid region
- NYISO (New York)
- Utility / transmission owner
- O&R
- Developer
- Little Pond Solar, LLC
- Connection point (POI)
- Mongaup - Shoemaker 69kV
- Location
- Orange County, New York
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Study phase
- FES, SIS, FS
- Queue status
- Active
- Entered queue
- 16 September 2016
- Agreement signed
- 29 January 2021
- Proposed online date
- September 2027
Location
Marker shows the centre of Orange County; the queue data does not give exact sites.
Other requests in Orange County
- Sugar Loaf Energy Storage IBattery storage · 300 MW · in study
- Arch 4Battery storage · 150 MW · in study
- Farmhouse BESSBattery storage · 150 MW · in study
- Arch 3Battery storage · 100 MW · in study
- CPV Valley Energy CenterGas · 691 MW · built
- CPV Valley Energy CenterGas · 691 MW · built
- Swinging Bridge Unit 3Hydro · 1.2 MW · built
- Swinging Bridge Unit 3Hydro · 1.2 MW · built
- CPV Valley IIGas · 820 MW · withdrawn
- Wawayanda Energy CenterGas · 500 MW · withdrawn
- Sugar Loaf Energy Storage IIBattery storage · 300 MW · withdrawn
- Grateful Storage, LLCBattery storage · 250 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem