OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 12

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 12 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Norte Vista
Solar + storage
386 MWWithdrawn / abandoned Fresno, CACAISO Apr 2021target 2024
Southland
Solar
380 MWWithdrawn / abandoned Clark, NVCAISO May 2016target 2023
Sourgrass Solar
Solar
380 MWWithdrawn / abandoned Tehama, CACAISO May 2017target 2020
Grand Ave- Combined Cycle
Gas
378 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2018
Birch Street - Combined Cycle
Gas
378 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2018
Zoroaster
Battery storage
378 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Carrizo 1
Solar
375 MWWithdrawn / abandoned San Luis Obispo, CACAISO Dec 2007target 2012
Draco Solar
Solar + storage
375 MWWithdrawn / abandoned Kern, CACAISO Apr 2019target 2023
El Centro 1
Solar
375 MWWithdrawn / abandoned Imperial, CACAISO Dec 2007target 2012
Ecp I
Solar
375 MWWithdrawn / abandoned San Bernardino, CACAISO Dec 2007target 2011
Patterson Pass Energy Center
Gas
371 MWWithdrawn / abandoned San Joaquin, CACAISO Oct 2007target 2015
DT Solar
Solar + storage
371 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Baja Vista Power Bank
Battery storage
370 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Sun Flats Energy Center
Solar + storage
370 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
East Wonder Solar
Solar + storage
368 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Lock 2
Battery storage
368 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Shake Out Solar
Solar + storage
365 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Socorro Peak Solar 2
Solar + storage
365 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
TGP NNP
Geothermal
364 MWWithdrawn / abandoned Churchill, NVCAISO Jul 2010target 2016
Blue Star Solar
Solar + storage
362 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
North SKY River II Wind
Onshore wind
362 MWWithdrawn / abandoned Kern, CACAISO Nov 2006target 2010
Royal (Fka Wheeler Indigo)
Solar + storage
360 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2019
Olivos
Battery storage
360 MWWithdrawn / abandoned CACAISO Apr 2021target 2024
Hiko
Battery storage
360 MWWithdrawn / abandoned Clark, NVCAISO Apr 2023target 2031
Peony
Solar
359 MWWithdrawn / abandoned Kern, CACAISO Apr 2019target 2022
Live Oak Storage
Battery storage
358 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2021target 2024
Silver Storage
Battery storage
358 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Brenda Renewable Energy Complex
Solar
358 MWWithdrawn / abandoned La Paz, AZCAISO Apr 2021target 2025
Soar Energy Storage
Battery storage
357 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Journey Storage
Battery storage
355 MWWithdrawn / abandoned Kings, CACAISO Apr 2019target 2022
Melody
Battery storage
354 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Landmark
Battery storage
353 MWWithdrawn / abandoned CACAISO Apr 2023target 2031
Coyote Flats Energy Center
Solar + storage
351 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Soda Mountain Solar Project
Solar
350 MWWithdrawn / abandoned San Bernardino, CACAISO May 2008target 2011
Round Mountain Wind Project
Onshore wind
350 MWWithdrawn / abandoned Shasta, CACAISO May 2008target 2011
Esteli Energy Storage
Battery storage
350 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2023target 2028
West Mojave Energy
Solar
350 MWWithdrawn / abandoned Kern, CACAISO Jul 2009target 2015
Tablerock
Solar + storage
347 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Andromeda
Solar + storage
346 MWWithdrawn / abandoned Tulare, CACAISO Apr 2021target 2029
Palermo Generating Station
Gas
345 MWWithdrawn / abandoned Sutter, CACAISO Sep 2007target 2012
Drew Road Generation
Gas
344 MWWithdrawn / abandoned Imperial, CACAISO Apr 2013target 2018
Hydrogen Energy California ( Heca ) Project
Other
340 MWWithdrawn / abandoned Kern, CACAISO Nov 2011target 2017
Kes Kingsburg
Gas
338 MWWithdrawn / abandoned Fresno, CACAISO May 2008target 2010
Doghouse Junction Energy Center
Gas
330 MWWithdrawn / abandoned San Diego, CACAISO Mar 2007target 2013
Mission Rock
Gas
326 MWWithdrawn / abandoned Ventura, CACAISO May 2016target 2020
Ventura Energy Center
Gas
326 MWWithdrawn / abandoned Ventura, CACAISO May 2017target 2020
Rio Oso Generating Station
Gas
325 MWWithdrawn / abandoned Sutter, CACAISO Oct 2007target 2012
Goldenrod
Solar + storage
321 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Melo
Solar + storage
321 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Pepper Grass
Solar + storage
321 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Page 12 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)