OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 12
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Norte Vista Solar + storage |
386 MW | Withdrawn / abandoned |
| Southland Solar |
380 MW | Withdrawn / abandoned |
| Sourgrass Solar Solar |
380 MW | Withdrawn / abandoned |
| Grand Ave- Combined Cycle Gas |
378 MW | Withdrawn / abandoned |
| Birch Street - Combined Cycle Gas |
378 MW | Withdrawn / abandoned |
| Zoroaster Battery storage |
378 MW | Withdrawn / abandoned |
| Carrizo 1 Solar |
375 MW | Withdrawn / abandoned |
| Draco Solar Solar + storage |
375 MW | Withdrawn / abandoned |
| El Centro 1 Solar |
375 MW | Withdrawn / abandoned |
| Ecp I Solar |
375 MW | Withdrawn / abandoned |
| Patterson Pass Energy Center Gas |
371 MW | Withdrawn / abandoned |
| DT Solar Solar + storage |
371 MW | Withdrawn / abandoned |
| Baja Vista Power Bank Battery storage |
370 MW | Withdrawn / abandoned |
| Sun Flats Energy Center Solar + storage |
370 MW | Withdrawn / abandoned |
| East Wonder Solar Solar + storage |
368 MW | Withdrawn / abandoned |
| Lock 2 Battery storage |
368 MW | Withdrawn / abandoned |
| Shake Out Solar Solar + storage |
365 MW | Withdrawn / abandoned |
| Socorro Peak Solar 2 Solar + storage |
365 MW | Withdrawn / abandoned |
| TGP NNP Geothermal |
364 MW | Withdrawn / abandoned |
| Blue Star Solar Solar + storage |
362 MW | Withdrawn / abandoned |
| North SKY River II Wind Onshore wind |
362 MW | Withdrawn / abandoned |
| Royal (Fka Wheeler Indigo) Solar + storage |
360 MW | Withdrawn / abandoned |
| Olivos Battery storage |
360 MW | Withdrawn / abandoned |
| Hiko Battery storage |
360 MW | Withdrawn / abandoned |
| Peony Solar |
359 MW | Withdrawn / abandoned |
| Live Oak Storage Battery storage |
358 MW | Withdrawn / abandoned |
| Silver Storage Battery storage |
358 MW | Withdrawn / abandoned |
| Brenda Renewable Energy Complex Solar |
358 MW | Withdrawn / abandoned |
| Soar Energy Storage Battery storage |
357 MW | Withdrawn / abandoned |
| Journey Storage Battery storage |
355 MW | Withdrawn / abandoned |
| Melody Battery storage |
354 MW | Withdrawn / abandoned |
| Landmark Battery storage |
353 MW | Withdrawn / abandoned |
| Coyote Flats Energy Center Solar + storage |
351 MW | Withdrawn / abandoned |
| Soda Mountain Solar Project Solar |
350 MW | Withdrawn / abandoned |
| Round Mountain Wind Project Onshore wind |
350 MW | Withdrawn / abandoned |
| Esteli Energy Storage Battery storage |
350 MW | Withdrawn / abandoned |
| West Mojave Energy Solar |
350 MW | Withdrawn / abandoned |
| Tablerock Solar + storage |
347 MW | Withdrawn / abandoned |
| Andromeda Solar + storage |
346 MW | Withdrawn / abandoned |
| Palermo Generating Station Gas |
345 MW | Withdrawn / abandoned |
| Drew Road Generation Gas |
344 MW | Withdrawn / abandoned |
| Hydrogen Energy California ( Heca ) Project Other |
340 MW | Withdrawn / abandoned |
| Kes Kingsburg Gas |
338 MW | Withdrawn / abandoned |
| Doghouse Junction Energy Center Gas |
330 MW | Withdrawn / abandoned |
| Mission Rock Gas |
326 MW | Withdrawn / abandoned |
| Ventura Energy Center Gas |
326 MW | Withdrawn / abandoned |
| Rio Oso Generating Station Gas |
325 MW | Withdrawn / abandoned |
| Goldenrod Solar + storage |
321 MW | Withdrawn / abandoned |
| Melo Solar + storage |
321 MW | Withdrawn / abandoned |
| Pepper Grass Solar + storage |
321 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)