United States βΊ Grid βΊ Interconnection queues βΊ California
SOLAR Β· CAISOEl Centro 1
El Centro 1 is a 375 MW solar request withdrawn in the CAISO interconnection queue, in Imperial County, California, connecting to SDGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2007 (completed)
- Withdrawn / abandonedMay 2008 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 286
- Grid region
- CAISO (California)
- Utility / transmission owner
- SDGE
- Connection point (POI)
- Southwest Power Link 500kV line
- Location
- Imperial County, California
- Technology
- Solar: 375 MW
- Total requested
- 375 MW
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 20 December 2007
- Proposed online date
- July 2012
- Withdrawn
- May 2008
Location
Marker shows the centre of Imperial County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in Imperial County
- UmbrielSolar + storage Β· 2,365 MW Β· agreement signed
- Silver Ridge Mount SignalSolar + storage Β· 750 MW Β· agreement signed
- Kingsley Solar FarmSolar + storage Β· 720 MW Β· agreement signed
- Ocotillo ExpressWind + storage Β· 504 MW Β· agreement signed
- Big Rock Solar FarmBattery storage Β· 200 MW Β· agreement signed
- Sunrise ButteSolar + storage Β· 150 MW Β· agreement signed
- Leconte Energy StorageBattery storage Β· 125 MW Β· agreement signed
- Solar + storage project GI-2022-164, Imperial CountySolar + storage Β· 800 MW Β· in study
- Yuha Desert Battery StorageBattery storage Β· 633 MW Β· in study
- Solar + storage project GI-2023-167, Imperial CountySolar + storage Β· 500 MW Β· in study
- Battery storage project GI-2023-168, Imperial CountyBattery storage Β· 387 MW Β· in study
- Solar + storage project GI-2022-162, Imperial CountySolar + storage Β· 270 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem