GAS Β· CAISO

Kes Kingsburg

Kes Kingsburg is a 338 MW gas request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
371
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
McCall-Kingsburg #1 & #2 115 kV lines
Location
Fresno County, California
Technology
Gas: 338 MW
Total requested
338 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
23 May 2008
Proposed online date
December 2010
Withdrawn
November 2008

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Fresno County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem