πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Nevada

GEOTHERMAL Β· CAISO

TGP NNP

TGP NNP is a 364 MW geothermal request withdrawn in the CAISO interconnection queue, in Churchill County, Nevada, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2010 (completed)
  2. Withdrawn / abandonedJun 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
643AR
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Control Sub 115 kV Bus
Location
Churchill County, Nevada
Technology
Geothermal: 364 MW
Total requested
364 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 July 2010
Proposed online date
June 2016
Withdrawn
June 2011

Location

Marker shows the centre of Churchill County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Churchill County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem