United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Royal (Fka Wheeler Indigo)

Royal (Fka Wheeler Indigo) is a 360 MW solar + storage request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2015 (completed)
  2. Withdrawn / abandonedJul 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1161
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Wheeler Ridge-Midway 230kV line
Location
Kern County, California
Technology
Solar: 180 MW · Battery: 181 MW
Total requested
360 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2015
Proposed online date
April 2019
Withdrawn
July 2015

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Kern County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem