Project stageOperating
  1. PlanningMay 2013 (completed)
  2. ConsentedAug 2013 (completed)
  3. ConstructionNov 2013 (completed)
  4. OperatingMar 2014 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
10.7 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
TA9 4LD
Coordinates
51.2253, -2.9446

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Watchfield Solar Farm compares

132nd of 662largest solar farms in the UK register
27th of 192in South West
0.19%of listed UK solar farms capacity
β‰ˆ 9.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 10.7 MW station would generate roughly 9.4 GWh of electricity in a year, similar to the annual use of about 3,470 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Watchfield Lawn
Developer / operator
Belltown Power
Planning authority
Somerset
Planning reference
12/13/00009
Application submitted
24 May 2013
Permission granted
1 August 2013
Construction started
7 November 2013
Began operating
12 March 2014
Capacity in planning record
10.2 MW
Address
Land at, Watchfield Lawn, Watchfield, Highbridge, TA9 4LD, Somerset
REPD reference
1681

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.