Wick Road is a 4.66 MW solar farm in South West England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 4.66 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- BS24 6RR
- Coordinates
- 51.2871, -2.9813
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Wick Road compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.66 MW station would generate roughly 4.1 GWh of electricity in a year, similar to the annual use of about 1,510 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by Greencoat CapitalNearby generating sites
- Wick Road CIC Β· 2.2 MW solar farm0.0 km
- Wick Red Farm Β· 4.95 MW solar farm0.3 km
- Brent Broad Β· 3.76 MW solar farm2.2 km
- Watchfield Solar Farm Β· 10.7 MW solar farm7.3 km
- Huntspill Β· 4.99 MW solar farm10.4 km
- Puriton Β· 4.57 MW solar farm12.4 km
- Pyde Drove Β· 8.44 MW solar farm12.8 km
- Rainbow Β· 4.79 MW solar farm12.9 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Wick Farm Solar Park
- Developer / operator
- Hadstone Energy/ Communities for Renewables
- Planning authority
- Somerset
- Planning reference
- 05/14/00019
- Application submitted
- 20 August 2014
- Permission granted
- 28 October 2014
- Construction started
- 1 April 2016
- Began operating
- 1 July 2016
- Capacity in planning record
- 14.6 MW
- Address
- S/O Wick Farm, Brean Road, Lympsham, Weston Super Mare, North Somerset, Somerset, BS24 0HD
- REPD reference
- 2274
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.