Huntspill
Huntspill is a 4.99 MW solar farm in South West England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 4.99 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- TA9 3PN
- Coordinates
- 51.1943, -2.9620
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Huntspill compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.99 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by Greencoat CapitalNearby generating sites
- Puriton Β· 4.57 MW solar farm2.1 km
- Rainbow Β· 4.79 MW solar farm3.0 km
- Pyde Drove Β· 8.44 MW solar farm3.2 km
- Watchfield Solar Farm Β· 10.7 MW solar farm3.7 km
- Park Wall Β· 5 MW solar farm8.3 km
- Brent Broad Β· 3.76 MW solar farm8.4 km
- Wick Road CIC Β· 2.2 MW solar farm10.4 km
- Wick Road Β· 4.66 MW solar farm10.4 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Huntspill Level Solar Park
- Developer / operator
- Wessex Solar Energy
- Planning authority
- Somerset
- Planning reference
- 25/15/00014
- Application submitted
- 19 June 2015
- Permission granted
- 11 September 2015
- Construction started
- 15 January 2016
- Began operating
- 15 March 2016
- Capacity in planning record
- 5.5 MW
- Address
- Bangor (bounded by Belfast Road, Somerset, TA9 3NP
- REPD reference
- 5440
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.