SOLAR Β· OPERATIONAL

NI Cluster Lough Road

NI Cluster Lough Road is a 5.4 MW solar farm in Northern Ireland, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Northern Ireland
Project stageOperating
  1. PlanningNov 2013 (completed)
  2. ConsentedJul 2014 (completed)
  3. ConstructionFeb 2016 (completed)
  4. OperatingApr 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5.4 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BT28 2PQ
Coordinates
54.5584, -6.1909

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How NI Cluster Lough Road compares

242nd of 662largest solar farms in the UK register
11th of 16in Northern Ireland
0.10%of listed UK solar farms capacity
β‰ˆ 4.7 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5.4 MW station would generate roughly 4.7 GWh of electricity in a year, similar to the annual use of about 1,750 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Northern Ireland All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Land to the South of 15 Lough Road
Developer / operator
Lightsource Renewable Energy
Planning authority
Lisburn and Castlereagh
Planning reference
S/2013/0625/F
Application submitted
19 November 2013
Permission granted
18 July 2014
Construction started
1 February 2016
Began operating
7 April 2016
Capacity in planning record
4.8 MW
Address
Land to the South of 15 Lough Road, Upper Ballinderry, Co. Antrim, BT28 2PQ
REPD reference
1296

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source