πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Lisburn

Lisburn is a 20.5 MW solar farm in Northern Ireland, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Northern Ireland
Project stageOperating
  1. PlanningJul 2014 (completed)
  2. ConsentedNov 2014 (completed)
  3. ConstructionJun 2016 (completed)
  4. OperatingFeb 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
20.5 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BT28 2SL
Coordinates
54.5181, -6.0994

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Lisburn compares

51st of 662largest solar farms in the UK register
3rd of 16in Northern Ireland
0.36%of listed UK solar farms capacity
β‰ˆ 18 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 20.5 MW station would generate roughly 18 GWh of electricity in a year, similar to the annual use of about 6,650 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Northern Ireland All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Ballinderry Road Solar Phase 1 (Lisburn)
Developer / operator
Hadstone Energy/Island Green Power
Planning authority
Lisburn and Castlereagh
Planning reference
S/2014/0492/F
Application submitted
22 July 2014
Permission granted
11 November 2014
Construction started
1 June 2016
Began operating
20 February 2017
Capacity in planning record
13.5 MW
Address
Lands located 110m WNW of 29 Ballinderry Road, Lisburn, Co. Antrim, BT28 2SL
REPD reference
2236

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.