Laurel Hill
Laurel Hill is a 14.2 MW solar farm in Northern Ireland, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Northern Ireland
Key facts
- Installed capacity
- 14.2 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- Northern Ireland
- Country
- Northern Ireland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- BT25 1JS
- Coordinates
- 54.4025, -6.2622
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Laurel Hill compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 14.2 MW station would generate roughly 12 GWh of electricity in a year, similar to the annual use of about 4,610 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Northern Ireland All run by Greencoat CapitalNearby generating sites
- Maghaberry Β· 27.1 MW solar farm12.5 km
- Lisburn Β· 20.5 MW solar farm16.6 km
- NI Cluster Lough Road Β· 5.4 MW solar farm17.9 km
- NI Cluster Hillside Β· 5.4 MW solar farm18.3 km
- NI Cluster Moira Road Β· 5.94 MW solar farm23.3 km
- NI Cluster Knockairn Road Β· 5.4 MW solar farm23.8 km
- NI Cluster Belfast Road Β· 9.99 MW solar farm27.6 km
- Crookedstone Β· 4.83 MW solar farm30.1 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.