NI Cluster Knockairn Road is a 5.4 MW solar farm in Northern Ireland, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Northern Ireland
Key facts
- Installed capacity
- 5.4 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Lightsource BP
- Region
- Northern Ireland
- Country
- Northern Ireland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- BT29 4UE
- Coordinates
- 54.6088, -6.1672
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How NI Cluster Knockairn Road compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5.4 MW station would generate roughly 4.7 GWh of electricity in a year, similar to the annual use of about 1,750 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Northern Ireland All run by Lightsource BPNearby generating sites
- NI Cluster Moira Road Β· 5.94 MW solar farm1.5 km
- NI Cluster Belfast Road Β· 9.99 MW solar farm4.5 km
- NI Cluster Hillside Β· 5.4 MW solar farm5.5 km
- NI Cluster Lough Road Β· 5.4 MW solar farm5.8 km
- Crookedstone Β· 4.83 MW solar farm7.2 km
- Lisburn Β· 20.5 MW solar farm11.0 km
- Maghaberry Β· 27.1 MW solar farm11.5 km
- Brett Martin Β· 6.49 MW solar farm12.2 km
Also operated by Lightsource BP
Lightsource BP operates 129 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Knockcairn Road
- Developer / operator
- Lightsource Renewable Energy
- Planning authority
- Antrim and Newtownabbey
- Planning reference
- T/2014/0066/F
- Application submitted
- 26 February 2014
- Permission granted
- 26 June 2014
- Construction started
- 21 November 2016
- Began operating
- 15 March 2017
- Capacity in planning record
- 6.5 MW
- Address
- 20 Knockcairn Road, Crumlin, Co. Antrim, BT29 4UE
- REPD reference
- 1789
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.