Gas projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1427.1 GW in total
In planning14scoping or awaiting consent
Consented or building7closest to connecting
Built83connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

14 projects
ProjectCapacityStageConnection siteFrom
Bute Hydrogen Project 1
Gas Β· Haldane Energy Project 1 Limited
4.8 GWScoping Trent Valley South Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2035
Bute Hydrogen Project 2
Gas Β· Haldane Energy Project 2 Limited
3.6 GWScoping Creyke Beck 400kV Substation
National Grid (England & Wales)
Oct 2035
Bute Hydrogen Project 3
Gas Β· Haldane Energy Project 3 Limited
3.6 GWScoping Grimsby West 400kV Substation
National Grid (England & Wales)
Oct 2035
Bute Hydrogen Project 5
Gas Β· Haldane Energy Project 5 Limited
3.6 GWScoping Teeside Connection Node B
National Grid (England & Wales)
Oct 2035
Bute Hydrogen Project 6
Gas Β· Haldane Energy Project 6 Limited
3.6 GWScoping Cheshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Bute Hydrogen Project 4
Gas Β· Haldane Energy Project 4 Limited
2.4 GWScoping Teeside Connection Node 2 C 132/400kV Substation
National Grid (England & Wales)
Oct 2035
Nursling Flexible Generation
Gas Β· South Eng Flexible Generation Limited
1.5 GWScoping Nursling 400kV Substation
National Grid (England & Wales)
Oct 2038
Peterhead Carbon Capture
Gas Β· Sse Thermal Generation (Scotland) Limited
910 MWScoping Peterhead 275kV
SSEN Transmission (north Scotland)
Oct 2033
Protos Power Station
Gas Β· Keadby Generation Limited
910 MWScoping Merseyside Connection Node A 400Kv Substation
National Grid (England & Wales)
Nov 2037
Stallingborough Carbon Capture Ccgt
Gas Β· RWE Generation UK Plc
906 MWScoping Grimsby West 400kV Substation
National Grid (England & Wales)
May 2035
Keadby North Power Station
Gas Β· Keadby Generation Limited
892 MWAwaiting Consents Keadby 400kV Substation
National Grid (England & Wales)
Oct 2031
VPI Immingham B OCGT
Gas Β· Vpi Immingham B Limited
299 MWScoping Humber Refinery 400kV Substation
National Grid (England & Wales)
Jan 2026
Exeter Main Tertiary
Gas Β· Exeter Main Battery Limited
57 MWScoping Exeter 400kV Substation
National Grid (England & Wales)
May 2024
Fleet Tertiary
Gas Β· Fleet Solar Limited
48 MWScoping Fleet 400kV Substation
National Grid (England & Wales)
Aug 2028

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.