GAS Β· NGETVPI Immingham B OCGT
VPI Immingham B OCGT is a 299 MW gas project in planning, connecting to the National Grid (England & Wales) network at Humber Refinery 400kV Substation, with capacity due from January 2026. The connection agreement is held by Vpi Immingham B Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jan 2026 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-000854
- Customer
- Vpi Immingham B Limited
- Technology
- OCGT (Open Cycle Gas Turbine)
- Total capacity
- 299 MW
- Change in this agreement
- +299 MW
- Capacity effective from
- 16 January 2026
- Connection site
- Humber Refinery 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Humber Refinery 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem