Home βΊ Grid infrastructure βΊ Connection queue
NESO TEC REGISTER Β· GREAT BRITAINGrid connection projects in the connection queue on the SP Transmission (south Scotland) network
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Inch Cape Offshore Wind Farm Platform 1 Offshore wind Β· Inch Cape Offshore Limited |
540 MW | Under Construction/Commissioning |
| Inch Cape Offshore Wind Farm Platform 2 Offshore wind Β· Inch Cape Offshore Limited |
540 MW | Under Construction/Commissioning |
| Eccles BESS Battery storage Β· Eccles Energy Centre Limited |
500 MW | Under Construction/Commissioning |
| Seagreen Phase 1A Offshore wind Β· Seagreen 1A Limited |
500 MW | Under Construction/Commissioning |
| Zenobe Eccles Battery Storage Battery storage Β· Zenobe Eccles Limited |
400 MW | Under Construction/Commissioning |
| Kilmarnock BESS Battery storage Β· Kilmarnock Flexpower Ltd |
350 MW | Under Construction/Commissioning |
| Gresham House Cockenzie BESS Battery storage Β· Cockenzie Storage Limited |
240 MW | Under Construction/Commissioning |
| Harestanes Wind + storage Β· Scottish Power Renewables (UK) Limited |
163 MW | Under Construction/Commissioning |
| Cockenzie BESS Battery storage Β· Cockenzie Storage B Ltd |
102 MW | Under Construction/Commissioning |
| Stranoch Wind Farm Onshore wind Β· Stranoch Windfarm Limited |
102 MW | Under Construction/Commissioning |
| Stranoch Wind Farm Onshore wind Β· Stranoch Windfarm Limited |
82 MW | Under Construction/Commissioning |
| Whitelaw Brae Windfarm Onshore wind Β· Whitelaw Brae Windfarm Limited |
57 MW | Under Construction/Commissioning |
| Bankside BESS Battery storage Β· Falkirk Power Ltd |
43 MW | Under Construction/Commissioning |
| Dalmarnock Road BESS Battery storage Β· Dalmarnock BESS Ltd |
40 MW | Under Construction/Commissioning |
| Whitelaw Brae BESS Battery storage Β· Buk23 Limited |
1 MW | Under Construction/Commissioning |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed βconnection nodesβ are listed but not mapped.