Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SPTStranoch Wind Farm
Stranoch Wind Farm is a 82 MW onshore wind project under construction or commissioning, connecting to the SP Transmission (south Scotland) network at Stranoch Wind 132/33kV Substation, with capacity due from December 2026. The connection agreement is held by Stranoch Windfarm Limited.
Project stageUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingFrom Dec 2026 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-000127-1
- Customer
- Stranoch Windfarm Limited
- Technology
- Wind Onshore
- Total capacity
- 82 MW
- Change in this agreement
- +82 MW
- Capacity effective from
- 18 December 2026
- Connection site
- Stranoch Wind 132/33kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Under Construction/Commissioning
- Connections reform gate
- Gate 2
Connection site
The connection site could not be placed on the map.
Other projects at Stranoch Wind 132/33kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem